Back to bathroom remodel contractors
Chtchetinin Construction
- Based in
- San Jose
- On San Francisco permits
- May 2016 to Aug 2019
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 0 days from filing to permit and 240 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 16, 2019 | Completed final sign-off Jun 2020 | 2308 Divisadero St | demo kitchen cabinets, 3 bathrooms tile, rewire all electrical line install with new subpaenk, replace galvanize pipes for copper, install new kitchen cabinets, tile floor and walls in kitchen & bathrooms. reparation for painting. no change of (e) floor plan.Details
demo kitchen cabinets, 3 bathrooms tile, rewire all electrical line install with new subpaenk, replace galvanize pipes for copper, install new kitchen cabinets, tile floor and walls in kitchen & bathrooms. reparation for painting. no change of (e) floor plan. | $21,500 |
| May 17, 2016 | Completed final sign-off Oct 2016 | 230 Lake Merced Hill St North St | unit 4c on the 4th floor - remodel (e) 2 bathrooms and kitchen. open wall/partial between kitchen and dining area; partial paint if required. floor replacementDetails
unit 4c on the 4th floor - remodel (e) 2 bathrooms and kitchen. open wall/partial between kitchen and dining area; partial paint if required. floor replacement | $36,000 |