Back to bathroom remodel contractors
Christos Alexandridis
- Based in
- San Francisco
- On San Francisco permits
- Apr 2026 to Apr 2026
- Last 24 months
- 1 permit filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 63 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 13, 2026 | Completed final sign-off Jun 2026 | 2155 Buchanan St | unit #4: demolish (e) bathroom, walls and floor to beams. remove part of (e) wall between bathroom and closet. move toilet and sink, build new wall for shower. lower ceiling by 5 inches including shower install heater floor, drywall walls and ceiling. install tiles on shower floor. install washer..Details
unit #4: demolish (e) bathroom, walls and floor to beams. remove part of (e) wall between bathroom and closet. move toilet and sink, build new wall for shower. lower ceiling by 5 inches including shower install heater floor, drywall walls and ceiling. install tiles on shower floor. install washer.. | $35,000 |