Chris Solberg Construction
- Based in
- Corte Madera
- On San Francisco permits
- Apr 2006 to Feb 2014
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 36 days from filing to permit and 194 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 18, 2006 | Completed final sign-off Dec 2006 | 319 Haight St | work is already done by former owner. needs to be permitted.see attached for description per 3r report# 4364. legalize (e) stair (side rear that require 2nd means egress), 2 1/2 bathrms, legalized lower rear deck to 3ft, remove metal balcony & replace with 6" guards, 2 rear windows & 1 door,Details
work is already done by former owner. needs to be permitted.see attached for description per 3r report# 4364. legalize (e) stair (side rear that require 2nd means egress), 2 1/2 bathrms, legalized lower rear deck to 3ft, remove metal balcony & replace with 6" guards, 2 rear windows & 1 door, | $40,000 |