Back to bathroom remodel contractors
Chris Nilsen Const.
- Based in
- Petaluma
- On San Francisco permits
- May 2002 to Oct 2024
- Last 24 months
- 0 permits filed
21 permits since 2000: 10 completed, 2 in progress, 3 never finaled, 6 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 384 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 28, 2003 | Completed final sign-off Sep 2004 | 2649 Clay St | remodel bathroom-replace plumbing fixtures&tile in upstairs& replace exist window in same location.Details
remodel bathroom-replace plumbing fixtures&tile in upstairs& replace exist window in same location. | $12,500 |
| Jul 12, 2002 | Expired or cancelled expired Sep 2006 | 2848 Washington St | install new plumbing and elextrical fixtures and tile in master bathroom level 3Details
install new plumbing and elextrical fixtures and tile in master bathroom level 3 | $20,000 |