Back to bathroom remodel contractors
Chinchilla Construction Administration
- Based in
- San Mateo
- On San Francisco permits
- Nov 2019 to Oct 2025
- Last 24 months
- 3 permits filed
13 permits since 2000: 10 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 never finaled. Typically 3 days from filing to permit and 225 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 10, 2025 | Completed final sign-off Feb 2026 | 140 San Fernando Wy | renovate master & guest bathrooms in 2nd flr. replace flooring. all plumbing fixture stay in same place. install 3 new recessed lights in each bathroom. no wall to be touched. electrical-replace knob & tube wiring for both bathrooms, master bedrm, & #1&2 bedrms, living rm. install new recessed...Details
renovate master & guest bathrooms in 2nd flr. replace flooring. all plumbing fixture stay in same place. install 3 new recessed lights in each bathroom. no wall to be touched. electrical-replace knob & tube wiring for both bathrooms, master bedrm, & #1&2 bedrms, living rm. install new recessed... | $65,000 |
| Jul 28, 2023 | Completed final sign-off Jan 2025 | 595 Los Palmos Dr | alterations to an existing sing family residence. condition existing basement/crawl space. addition of 1 new bathroomDetails
alterations to an existing sing family residence. condition existing basement/crawl space. addition of 1 new bathroom | $115,000 |
| Oct 12, 2022 | Completed final sign-off May 2023 | 607 Los Palmos Dr | new bathroom constructed in (e) storage roomDetails
new bathroom constructed in (e) storage room | $40,000 |
| Nov 20, 2019 | Never finaled issued Nov 2019, no final | 132 Clinton Pk | unit 2: kitchen and bathroom remodel. kitchen-cabinets, countertops, new appliances. bathroom-same layout, full remodel such as tiles, medicine cabinet. no change on wallsDetails
unit 2: kitchen and bathroom remodel. kitchen-cabinets, countertops, new appliances. bathroom-same layout, full remodel such as tiles, medicine cabinet. no change on walls | $12,000 |