Back to bathroom remodel contractors
Chen's Construction And Mechanical Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2006 to Jan 2025
- Last 24 months
- 3 permits filed
18 permits since 2000: 12 completed, 3 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 6 completed, 1 in progress. Typically 1 days from filing to permit and 350 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 24, 2024 | Completed final sign-off Feb 2026 | 199 Brentwood Av | 1st fl: add family, office, entertainment,1 bedroom & 2 full baths. relocate laundry & utilities. 2nd fl: total remodel add full bathDetails
1st fl: add family, office, entertainment,1 bedroom & 2 full baths. relocate laundry & utilities. 2nd fl: total remodel add full bath | $260,000 |
| Jul 10, 2024 | Completed final sign-off Mar 2025 | 2126 41st Av | remodel 2 bathrooms. replacing existing fixtures with no layout changeDetails
remodel 2 bathrooms. replacing existing fixtures with no layout change | $20,000 |
| Jun 17, 2024 | Completed final sign-off Apr 2026 | 4501 Ocean Av | remodel (e) kitchen & bathroom. replace 9 windows. replace aluminum new windowsDetails
remodel (e) kitchen & bathroom. replace 9 windows. replace aluminum new windows | $38,000 |
| May 15, 2024 | Completed final sign-off Jan 2025 | 867 33rd Av | 1st floor: add 3 bedrooms, and family. remodel bathroom. 2nd floor: remodel kitchen and bathroom. relocate interior stair.Details
1st floor: add 3 bedrooms, and family. remodel bathroom. 2nd floor: remodel kitchen and bathroom. relocate interior stair. | $110,000 |
| May 5, 2023 | Completed final sign-off Mar 2025 | 18 Radio Tr | comply with nov#2023-05332, 202287834, 202307631 exterior stucco repair two sides less than 50%, remodel two bathrooms new vanity, new fixtures, new showerDetails
comply with nov#2023-05332, 202287834, 202307631 exterior stucco repair two sides less than 50%, remodel two bathrooms new vanity, new fixtures, new shower | $25,000 |
| Dec 28, 2021 | Completed final sign-off Mar 2022 | 938 Garfield St | add 2nd kitchen at gr fl, legalize bath at gr fl, legalize 3 baths, 1 kitchen remodel at 2nd and 3rd fl, install electrical outlet and light throughout the houseDetails
add 2nd kitchen at gr fl, legalize bath at gr fl, legalize 3 baths, 1 kitchen remodel at 2nd and 3rd fl, install electrical outlet and light throughout the house | $40,888 |
| Dec 9, 2020 | In progress issued Jul 2024 | 580 Bryant St | legalize as built cannabis grow operation. partially convert (e) office/storage to (n) office/light manufacturing. add new accessible bathroom. to comply to nov 202056641/202056441/202056451. cultivation only.Details
legalize as built cannabis grow operation. partially convert (e) office/storage to (n) office/light manufacturing. add new accessible bathroom. to comply to nov 202056641/202056441/202056451. cultivation only. | $60,000 |