Back to bathroom remodel contractors
Chaus Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2020 to Dec 2024
- Last 24 months
- 1 permit filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 192 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 12, 2024 | Completed final sign-off Mar 2025 | 586 35th Av | a like downstairs bathroom remodel tub to walk in shower add heat vent fan add new recessed lights downstairs bedroom play room and hallway repair drywall replace mini bar cabinets and counter topDetails
a like downstairs bathroom remodel tub to walk in shower add heat vent fan add new recessed lights downstairs bedroom play room and hallway repair drywall replace mini bar cabinets and counter top | $12,000 |
| Apr 28, 2023 | Completed final sign-off Nov 2023 | 2464 34th Av | remodel 2nd flr kitchen & bathroom, replace patio door @ interior, replace 2nd flr interior doors, closet doors, upgrade ungrounded electrical outlets, add recessed ceiling lights. same size and location.Details
remodel 2nd flr kitchen & bathroom, replace patio door @ interior, replace 2nd flr interior doors, closet doors, upgrade ungrounded electrical outlets, add recessed ceiling lights. same size and location. | $8,000 |
| Oct 5, 2020 | Completed final sign-off Dec 2021 | 2479 38th Av | 3 bathrooms: tiles, countertop, toilet replacement. kitchen and wetbar cabinets countertops replacement. new hardfloorDetails
3 bathrooms: tiles, countertop, toilet replacement. kitchen and wetbar cabinets countertops replacement. new hardfloor | $38,000 |