Back to bathroom remodel contractors
Charles Lakamp
- Based in
- San Francisco
- On San Francisco permits
- Apr 2015 to May 2015
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 never finaled. Typically 0 days from filing to permit and 440 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 1, 2015 | Completed final sign-off Oct 2015 | 409 Laguna St | #213 - remodel 1 kitchen & 1 bathroom. replacement of cabinetry, new kitchen floor, re-wiring of general circuits, removal of abandoned gas lines, new gas line for heater, paint. no alteration of wall, window & door.Details
#213 - remodel 1 kitchen & 1 bathroom. replacement of cabinetry, new kitchen floor, re-wiring of general circuits, removal of abandoned gas lines, new gas line for heater, paint. no alteration of wall, window & door. | $15,000 |
| Apr 13, 2015 | Never finaled issued Jul 2015, no final | 4118 17th St | cabinetry replacement, rewiring as ncessary, flooring, paint, electrical & plumbing repairs, 1 bath remodelDetails
cabinetry replacement, rewiring as ncessary, flooring, paint, electrical & plumbing repairs, 1 bath remodel | $20,000 |
| Apr 13, 2015 | Completed final sign-off Apr 2017 | 291 Divisadero St | replace cabinetry, new flooring, replace kitchen circuitryk paint, plumbing and electrical repairs throughout unit as erquired. 1.5 bath remodelDetails
replace cabinetry, new flooring, replace kitchen circuitryk paint, plumbing and electrical repairs throughout unit as erquired. 1.5 bath remodel | $30,000 |