Back to bathroom remodel contractors
Charles Brusch
- Based in
- Nevada City
- On San Francisco permits
- Dec 2007 to Oct 2019
- Last 24 months
- 0 permits filed
8 permits since 2000: 5 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 2 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 399 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2018 | Completed final sign-off Jan 2020 | 1 Idora Av | replace front & side windows in (e) opening. replace rears windows w/sliding doors. add new rear deck, new site stair & retainin wall. remodel kitchen & 2 baths. enlarge opening to l.r & d.r. add new closet, change bedroom doors, enlarge bdrm 3 closet, new ductsDetails
replace front & side windows in (e) opening. replace rears windows w/sliding doors. add new rear deck, new site stair & retainin wall. remodel kitchen & 2 baths. enlarge opening to l.r & d.r. add new closet, change bedroom doors, enlarge bdrm 3 closet, new ducts | $125,000 |
| Oct 25, 2016 | Completed final sign-off Nov 2017 | 1214 35th Av | remodel kitchen & bathroom. no alteration of wall, window or door.Details
remodel kitchen & bathroom. no alteration of wall, window or door. | $28,000 |
| May 5, 2015 | Expired or cancelled expired Jun 2017 | 1800 Gough St | #2-bathroom remodel, all fixtures same location, no wall removal or change.Details
#2-bathroom remodel, all fixtures same location, no wall removal or change. | $35,000 |
| Dec 13, 2007 | Expired or cancelled expired Dec 2010 | 204 Ivy St | work @ studio apt# 300 only. update & repair electrical & plumbing. repair walls from elect & plumbing. install new cabinets in kitchen. tile floors in bathroom; kitchen. repaint to completion.Details
work @ studio apt# 300 only. update & repair electrical & plumbing. repair walls from elect & plumbing. install new cabinets in kitchen. tile floors in bathroom; kitchen. repaint to completion. | $15,000 |