Back to bathroom remodel contractors
Chang Jie Lu
- Based in
- Fremont
- On San Francisco permits
- Jun 2010 to Jun 2016
- Last 24 months
- 0 permits filed
4 permits since 2000: 3 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 45 days from filing to permit and 377 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 7, 2016 | Completed final sign-off Dec 2016 | 49 Santa Cruz Av | revision to app#201510069008. new jacuzzi on 3rd floor in master bathroom. relocate doorway in bedroom. remove section wall to open up kitchen area. remodel one bathroom.Details
revision to app#201510069008. new jacuzzi on 3rd floor in master bathroom. relocate doorway in bedroom. remove section wall to open up kitchen area. remodel one bathroom. | $10,000 |
| Oct 6, 2015 | Completed final sign-off Dec 2016 | 49 Santa Cruz Av | remodel (e) bathroom, bath tub to shower stall; remodel (e) kitchen; replace windows not visible from street.Details
remodel (e) bathroom, bath tub to shower stall; remodel (e) kitchen; replace windows not visible from street. | $45,000 |
| Jun 4, 2010 | Completed final sign-off Jul 2011 | 1635 21st Av | enclose existing horizontal extension at rear on the 1st floor to be study room. new partitions, lighting, electrical, window and wood siding to match existing extrior siding. legalize existing bathroom at gr flDetails
enclose existing horizontal extension at rear on the 1st floor to be study room. new partitions, lighting, electrical, window and wood siding to match existing extrior siding. legalize existing bathroom at gr fl | $18,250 |