Back to bathroom remodel contractors
Cesario S Ocampo
- Based in
- South San Francisco
- On San Francisco permits
- Jul 2008 to Apr 2010
- Last 24 months
- 0 permits filed
12 permits since 2000: 9 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 4 completed, 1 never finaled, 1 expired or cancelled. Typically 18 days from filing to permit and 288 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 13, 2010 | Never finaled issued Apr 2010, no final | 2514 Folsom St | all floors: to comply with his citation 201034441,as needed,replace all windows on front elevation. w/double-hung windows. repair hazardous wiring, install smoke detectors, repair front & rear doors, repair bathroom walls.Details
all floors: to comply with his citation 201034441,as needed,replace all windows on front elevation. w/double-hung windows. repair hazardous wiring, install smoke detectors, repair front & rear doors, repair bathroom walls. | $7,500 |
| Sep 15, 2009 | Completed final sign-off Jul 2010 | 57 Forest Side Av | repair walls with 5/8 type x sheet rock in bedrooms, hallway, living room. replace leaking windows in rear and side. repair dry rotted window frame and at fireplace.remodel existing bathrooms. note: second floor as-built plans in reference to bpa#200907102364.Details
repair walls with 5/8 type x sheet rock in bedrooms, hallway, living room. replace leaking windows in rear and side. repair dry rotted window frame and at fireplace.remodel existing bathrooms. note: second floor as-built plans in reference to bpa#200907102364. | $15,000 |
| Jul 10, 2009 | Completed final sign-off Jul 2019 | 57 Forest Side Av | 1. install a new grade beam foundation. 2. reinforce existing foundation with a new grade beam approximately 25 feet 3. install new column on the corner of retaining wall due to the cracked. 4. second floor-bathroom and kitchen remodelling same location.Details
1. install a new grade beam foundation. 2. reinforce existing foundation with a new grade beam approximately 25 feet 3. install new column on the corner of retaining wall due to the cracked. 4. second floor-bathroom and kitchen remodelling same location. | $12,000 |
| Jul 1, 2009 | Expired or cancelled expired Jun 2013 | 80 Sussex St | repair & remodel of bathroom due to dry rot, plumbing problem and damaged wall caused by leak, provide high efficacy lights or o.s. in bathroomDetails
repair & remodel of bathroom due to dry rot, plumbing problem and damaged wall caused by leak, provide high efficacy lights or o.s. in bathroom | $8,000 |
| Apr 23, 2009 | Completed final sign-off Aug 2009 | 357 Moscow St | garage level alteration per plan. new bathroom and study room.Details
garage level alteration per plan. new bathroom and study room. | $20,000 |
| Sep 30, 2008 | Completed final sign-off May 2010 | 37 Cragmont Av | horizontal addition (890 sf) total 2 floors, incorporating new kitchen, bathroom, dining room & bedroom. remove existing kitchen to make way for new bathroom including electrical & plumbing work. new wood decking at 2nd floor and 3rd floor w/spiral staircase thru roof.Details
horizontal addition (890 sf) total 2 floors, incorporating new kitchen, bathroom, dining room & bedroom. remove existing kitchen to make way for new bathroom including electrical & plumbing work. new wood decking at 2nd floor and 3rd floor w/spiral staircase thru roof. | $200,000 |