Centric Construction Inc
- Based in
- Brisbane
- On San Francisco permits
- Mar 2007 to Oct 2026
- Last 24 months
- 14 permits filed
313 permits since 2000: 237 completed, 6 in progress, 58 never finaled, 12 expired or cancelled.
Of the 58 never-finaled permits, 3 are 3 to 5 years old, 23 are 5 to 10 years old, 32 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 1 completed, 1 never finaled. Typically 31 days from filing to permit and 215 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 15, 2014 | Completed final sign-off Jun 2015 | 1301 Illinois St | new deck for existing prefabricated structure. deck to include ramp and handrails. new shed, new wetland, new insulation on foundation, new minor repairs, ref. 201409116038; maher n/aDetails
new deck for existing prefabricated structure. deck to include ramp and handrails. new shed, new wetland, new insulation on foundation, new minor repairs, ref. 201409116038; maher n/a | $202,600 |
| Feb 21, 2014 | Never finaled issued Mar 2014, no final | 1 Jefferson St | infill existing slab opening between retail spaces 140 and 240. installation of metal deck floor extension at level 2. installation of non structural partitions. sprinklers under separate permit, ref #2014.0212.8418. compliance with ordinance #155-13 not required.Details
infill existing slab opening between retail spaces 140 and 240. installation of metal deck floor extension at level 2. installation of non structural partitions. sprinklers under separate permit, ref #2014.0212.8418. compliance with ordinance #155-13 not required. | $15,000 |