Back to bathroom remodel contractors
Cello & Maudru Construction Co Inc
- Based in
- Napa
- On San Francisco permits
- Mar 2000 to Jun 2026
- Last 24 months
- 6 permits filed
76 permits since 2000: 48 completed, 2 in progress, 5 never finaled, 21 expired or cancelled.
Of the 5 never-finaled permits, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 5 completed, 1 never finaled, 4 expired or cancelled. Typically 6 days from filing to permit and 200 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 15, 2018 | Expired or cancelled cancelled Dec 2022 | 3255 Octavia St | interior renovation of 2 units including bathrooms, relocate e kitchens, alter rear facade, full seismic upgrade to existing foundation and wood framing fire protection under sep permit infill lightwell, windows, roof deckDetails
interior renovation of 2 units including bathrooms, relocate e kitchens, alter rear facade, full seismic upgrade to existing foundation and wood framing fire protection under sep permit infill lightwell, windows, roof deck | $200,000 |
| Oct 23, 2017 | Completed final sign-off Sep 2020 | 147 Laidley St | interior remodel on all 3 floors scope includes redesigned kitchen and baths, removal of 2 tiny window at gr fl, rear replacement of rear eck handrail with metalDetails
interior remodel on all 3 floors scope includes redesigned kitchen and baths, removal of 2 tiny window at gr fl, rear replacement of rear eck handrail with metal | $35,000 |
| May 1, 2017 | Completed final sign-off Jul 2017 | 5 Montague Pl | residential renovation of home's lower unit: new kitchen cabinets, new bathroom caibnets, new tile and shower, inteiror paint.Details
residential renovation of home's lower unit: new kitchen cabinets, new bathroom caibnets, new tile and shower, inteiror paint. | $200,000 |
| Apr 7, 2016 | Completed final sign-off Sep 2016 | 301 Bryant St | kitchen, master bath and master closet renovations. maher na. life safety deferred, if required.Details
kitchen, master bath and master closet renovations. maher na. life safety deferred, if required. | $100,000 |
| Jan 13, 2015 | Never finaled issued Mar 2016, no final | 44 Glover St | horizontal/vertical addition. add garage, kitchen & bathroom remodel, change entry, add master suite, 2 decks top floor, new roof deck, interior remodel.Details
horizontal/vertical addition. add garage, kitchen & bathroom remodel, change entry, add master suite, 2 decks top floor, new roof deck, interior remodel. | $250,000 |
| Oct 16, 2013 | Completed final sign-off Dec 2016 | 1521 Cole St | main floor remodel-kitchen & bathroom remodel, no structural. new flooring & interior doorsDetails
main floor remodel-kitchen & bathroom remodel, no structural. new flooring & interior doors | $80,000 |
| Aug 24, 2010 | Expired or cancelled expired Nov 2011 | 2555 Leavenworth St | unit 204: install new drain, mortar bed, tile, and lights. bathroom remodel tile only. new lighting comply with cec 150 (k)Details
unit 204: install new drain, mortar bed, tile, and lights. bathroom remodel tile only. new lighting comply with cec 150 (k) | $1,000 |
| Jun 28, 2002 | Expired or cancelled expired Aug 2003 | 2560 Divisadero St | bath room remodel total of 2 on 2nd floor/interior renovations onlyDetails
bath room remodel total of 2 on 2nd floor/interior renovations only | $45,000 |
| Jun 1, 2000 | Expired or cancelled expired Jan 2005 | 880 El Camino Del Mar | lower level addition bedrm,hall,closets,bath/extend garage/deck reconfigured/eliminate bath,xted denDetails
lower level addition bedrm,hall,closets,bath/extend garage/deck reconfigured/eliminate bath,xted den | $500,000 |
| Mar 16, 2000 | Completed final sign-off Oct 2000 | 75 Folsom St | remodel one bath & add an open island cabinets at condo unit no. 1603Details
remodel one bath & add an open island cabinets at condo unit no. 1603 | $15,000 |