Back to bathroom remodel contractors
Caruso Construction Inc.
- Based in
- Pacifica
- On San Francisco permits
- Oct 2001 to Jun 2026
- Last 24 months
- 7 permits filed
198 permits since 2000: 172 completed, 2 in progress, 10 never finaled, 14 expired or cancelled.
Of the 10 never-finaled permits, 2 are 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
61 bathroom remodel permits: 56 completed, 1 in progress, 2 never finaled, 2 expired or cancelled. Typically 2 days from filing to permit and 278 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 30, 2025 | In progress issued Apr 2026 | 647 11th Av | 2nd fl: kitchen remodel. all bedrooms remodeled. primary bath remodel, expansion of powder room to full bath. 1 new windows. 1 new exterior door to new backyard wood deck. all e windows replace in kind. all new interior doors, new trim and baseboards. e flooring to remin uon. no sliders at the fronDetails
2nd fl: kitchen remodel. all bedrooms remodeled. primary bath remodel, expansion of powder room to full bath. 1 new windows. 1 new exterior door to new backyard wood deck. all e windows replace in kind. all new interior doors, new trim and baseboards. e flooring to remin uon. no sliders at the fron | $150,000 |
| Nov 14, 2023 | Expired or cancelled expired Apr 2026 | 274 Casitas Av | replacement of interior stair (connecting 2nd fl to 1st fl) with new interior stair connecting 2nd fl to lower level. enclosing open area under (e) stair. removal of (e) exterior stair and cantilevered decks replacement. guest bath and master bath remodel (no layout changes). replacement ofDetails
replacement of interior stair (connecting 2nd fl to 1st fl) with new interior stair connecting 2nd fl to lower level. enclosing open area under (e) stair. removal of (e) exterior stair and cantilevered decks replacement. guest bath and master bath remodel (no layout changes). replacement of | $80,000 |
| Jan 19, 2023 | Completed final sign-off Jun 2023 | 62 06th Av | remodel (2) existing bathrooms (62 6th ave). replace fixtures, cabinets, and tile in kind. no structural work.Details
remodel (2) existing bathrooms (62 6th ave). replace fixtures, cabinets, and tile in kind. no structural work. | $42,000 |
| Jul 6, 2022 | Completed final sign-off Jun 2023 | 64 06th Av | renovate kitchen , 2 bathrooms and mudroom. partial infill of lightwell, convert bedroom to wetbar, recofigure walls. paint exterior 4 interior.Details
renovate kitchen , 2 bathrooms and mudroom. partial infill of lightwell, convert bedroom to wetbar, recofigure walls. paint exterior 4 interior. | $125,000 |
| Apr 22, 2022 | Completed final sign-off Nov 2022 | 61 San Andreas Wy | 1st fl: (e) kitchen remodel, master bathroom remodel, half bath remodel. 2nd fl: remodel existing bathroom, replace toilet, sink and tubDetails
1st fl: (e) kitchen remodel, master bathroom remodel, half bath remodel. 2nd fl: remodel existing bathroom, replace toilet, sink and tub | $10,000 |
| Oct 27, 2021 | Completed final sign-off Nov 2022 | 61 San Andreas Wy | remodel existing kitchen and 1 1/2 baths. replace existing cabinets and fixtures in kind. no structural work.Details
remodel existing kitchen and 1 1/2 baths. replace existing cabinets and fixtures in kind. no structural work. | $135,000 |
| Jun 8, 2021 | Completed final sign-off Feb 2023 | 51 San Andreas Wy | kitchen, master bathroom & family room renovation. no structural work.Details
kitchen, master bathroom & family room renovation. no structural work. | $175,000 |
| Apr 23, 2021 | Completed final sign-off Jul 2022 | 24 Rosewood Dr | remodel 1 master bath.remove and replace existing fixtures. plumbing and elec in kind. no structural. no new wall or relocation. new lighting shall comply with cec 150 kDetails
remodel 1 master bath.remove and replace existing fixtures. plumbing and elec in kind. no structural. no new wall or relocation. new lighting shall comply with cec 150 k | $25,000 |
| Mar 19, 2021 | Completed final sign-off Feb 2023 | 51 San Andreas Wy | remove and replace existing cabinets and fixtures in kitchen; one bathroom in kind; no structural work. no plumbing fixture relocation. any new lighting work to comply w/ cec150.0(k)5. no wall removal/ replacement.Details
remove and replace existing cabinets and fixtures in kitchen; one bathroom in kind; no structural work. no plumbing fixture relocation. any new lighting work to comply w/ cec150.0(k)5. no wall removal/ replacement. | $85,000 |
| Jan 29, 2021 | Never finaled issued Jul 2021, no final | 60 Hazelwood Av | partially excavate (e) lower level to create new bedroom, bathroom and sitting room. renovate ktichen at upper level. replce interior stairs.Details
partially excavate (e) lower level to create new bedroom, bathroom and sitting room. renovate ktichen at upper level. replce interior stairs. | $140,000 |
| Jan 27, 2021 | Completed final sign-off Nov 2021 | 231 18th Av | revision to no plan pa# 202012090607: remodel unconditioned space on 1st level to convert to new living area to include new bedroom & bathroom. remodel 2nd level for new internal staircase.Details
revision to no plan pa# 202012090607: remodel unconditioned space on 1st level to convert to new living area to include new bedroom & bathroom. remodel 2nd level for new internal staircase. | $80,000 |
| May 12, 2020 | Completed final sign-off Apr 2021 | 20 San Andreas Wy | kitchen and 2 bath remodel. replace cbinets, countertops, fixtures and appliances, in-kind. no structural work will be performed.Details
kitchen and 2 bath remodel. replace cbinets, countertops, fixtures and appliances, in-kind. no structural work will be performed. | $125,000 |
| Nov 8, 2019 | Completed final sign-off Mar 2020 | 3325 Jackson St | remove/replace (e) plumbing/electrical fixtures & finishes, in-kind. (1) bathroom. redo (e) closet interior. no structural work. no alteration of walls.Details
remove/replace (e) plumbing/electrical fixtures & finishes, in-kind. (1) bathroom. redo (e) closet interior. no structural work. no alteration of walls. | $50,000 |
| Mar 11, 2019 | Completed final sign-off Dec 2019 | 256 Casitas Av | revision to 201704073430-s1. to include new bath at 1st flr lower level, division of 1st flr lower level storage w/1 hr rated fire seperation, and division of basement storage level storage. w/1hr rated fire seperation. new title 24Details
revision to 201704073430-s1. to include new bath at 1st flr lower level, division of 1st flr lower level storage w/1 hr rated fire seperation, and division of basement storage level storage. w/1hr rated fire seperation. new title 24 | $18,202 |
| Mar 7, 2019 | Completed final sign-off Dec 2019 | 836 Bay St | remodel 3 (e) bathrooms. remove (e) fixts. plumb/elect & replace in-kind. no structural work. size approx 6'x7' each.Details
remodel 3 (e) bathrooms. remove (e) fixts. plumb/elect & replace in-kind. no structural work. size approx 6'x7' each. | $44,058 |
| Feb 12, 2019 | Completed final sign-off Feb 2020 | 165 28th Av | add ramp at front yard, enlarge garage, add 3 rear windows, add elevator, renovate kitchen and baths, relocate kitchen and dining, renovate basement and garage, move laundryDetails
add ramp at front yard, enlarge garage, add 3 rear windows, add elevator, renovate kitchen and baths, relocate kitchen and dining, renovate basement and garage, move laundry | $90,000 |
| Dec 7, 2018 | Completed final sign-off Dec 2021 | 2749 Steiner St | horizontal addition at rear. convert exterior entry to interior entry foyer. renovate kitchen. relocate landry room. renovate 2 bathrooms at 3rd floor.Details
horizontal addition at rear. convert exterior entry to interior entry foyer. renovate kitchen. relocate landry room. renovate 2 bathrooms at 3rd floor. | $100,000 |
| Feb 22, 2018 | Completed final sign-off Sep 2018 | 1333 Jones St | remodel kitchen & bathroom. replace cabinets & fixtures (plumbing & electrical) in kind, no structural work.Details
remodel kitchen & bathroom. replace cabinets & fixtures (plumbing & electrical) in kind, no structural work. | $30,000 |
| Oct 2, 2017 | Completed final sign-off Aug 2018 | 2111 Hyde St | unit 500: demo and relocate non-bearing walls. no structural work. relocate kitchen and laundry. renovate 3 bathrooms. update elect & plumbing. n/a for maherDetails
unit 500: demo and relocate non-bearing walls. no structural work. relocate kitchen and laundry. renovate 3 bathrooms. update elect & plumbing. n/a for maher | $120,000 |
| Jun 5, 2017 | Completed final sign-off Apr 2018 | 850 Dolores St | infill lightwell, replace rear door, add powder room, legalize g/f living space, add skylights, add bedroom, renovate bathrooms.Details
infill lightwell, replace rear door, add powder room, legalize g/f living space, add skylights, add bedroom, renovate bathrooms. | $60,000 |
| Mar 9, 2017 | Completed final sign-off Oct 2017 | 3053 Franklin St | replace (e) kitchen cabinets in-kind. remodel one bathroom replacing fixtures in-kind, and replace (e) windows in-kind. windows not visible to the street.Details
replace (e) kitchen cabinets in-kind. remodel one bathroom replacing fixtures in-kind, and replace (e) windows in-kind. windows not visible to the street. | $65,000 |
| Mar 3, 2017 | Completed final sign-off May 2018 | 3756 Jackson St | ground flr: convert (e) home/office to be new sitting area; add 2 new bathrooms at basement level, lower concrete flr to rear yard. rear yard- lower grade to align w/new basement flr. waterproofing repair ar front facade. upgrade (e) elevator maher naDetails
ground flr: convert (e) home/office to be new sitting area; add 2 new bathrooms at basement level, lower concrete flr to rear yard. rear yard- lower grade to align w/new basement flr. waterproofing repair ar front facade. upgrade (e) elevator maher na | $250,000 |
| Sep 12, 2016 | Completed final sign-off Jul 2021 | 1232 Sanchez St | interior remodel of (e) single family home - redo kitchen and master. voluntary structural strengthening @ (e) garage entry. removal of non-permitted storage area. convert part of storage at garage/bsmt to 1 bedroom and 1 bath.Details
interior remodel of (e) single family home - redo kitchen and master. voluntary structural strengthening @ (e) garage entry. removal of non-permitted storage area. convert part of storage at garage/bsmt to 1 bedroom and 1 bath. | $385,200 |
| Aug 3, 2016 | Completed final sign-off Jul 2017 | 185 San Leandro Wy | renovate kitchen, powder rm, two baths, demo & relocate one bath, replace & repair & relocate windows, add wood deck less than 30" above grade, replace roof deck wall, add finish at basement.Details
renovate kitchen, powder rm, two baths, demo & relocate one bath, replace & repair & relocate windows, add wood deck less than 30" above grade, replace roof deck wall, add finish at basement. | $80,000 |
| Jan 5, 2016 | Completed final sign-off Jul 2016 | 999 Green St | #2905- remodel (e) bathroom, new plumbing fixtures and new electrical work, no structural work will be done.Details
#2905- remodel (e) bathroom, new plumbing fixtures and new electrical work, no structural work will be done. | $8,000 |
| May 18, 2015 | Completed final sign-off Aug 2017 | 112 Upper Tr | rear horizontal addition for kitchen renovation & half bath.Details
rear horizontal addition for kitchen renovation & half bath. | $150,000 |
| May 4, 2015 | Completed final sign-off Feb 2016 | 3850 Jackson St | infill of lightwell at 3rd floor - to expand master bathroom. no other work.Details
infill of lightwell at 3rd floor - to expand master bathroom. no other work. | $25,000 |
| Mar 31, 2015 | Completed final sign-off Feb 2016 | 3850 Jackson St | 1. infill lightwell @ basement 1st & 2nd floor - not visible from st. 2. replace windows "in kind" at front & as shown in rear, add door. 3. renovate kitchen, powder room & 3 baths. 4. add bath on 3rd floor.Details
1. infill lightwell @ basement 1st & 2nd floor - not visible from st. 2. replace windows "in kind" at front & as shown in rear, add door. 3. renovate kitchen, powder room & 3 baths. 4. add bath on 3rd floor. | $60,000 |
| Feb 4, 2015 | Completed final sign-off Dec 2015 | 207 Cherry St | new rear balcony and patio doors at 1st fl. replace windows. renovate kitchen and 1 bath. paint interiorDetails
new rear balcony and patio doors at 1st fl. replace windows. renovate kitchen and 1 bath. paint interior | $125,000 |
| Feb 3, 2015 | Completed final sign-off Jan 2016 | 2164 Hyde St | #612 - interior bath & kitchen remodel: remove & replace existing with new fixtures tile, cabinets. no structural work.Details
#612 - interior bath & kitchen remodel: remove & replace existing with new fixtures tile, cabinets. no structural work. | $75,000 |
| Oct 17, 2014 | Completed final sign-off May 2016 | 27 Buena Vista Tr | dry rot repair - master bath ceiling, basement, & first floor stairwell.Details
dry rot repair - master bath ceiling, basement, & first floor stairwell. | $15,000 |
| Oct 14, 2014 | Completed final sign-off Oct 2014 | 36 Divisadero St | revision to appl #2013.0806.3645: elimination of clear story window in master bath, change of direction of main staircase, elimination of 6" steps up to master bathroom. eliminate back stairs & add railing to the new door.Details
revision to appl #2013.0806.3645: elimination of clear story window in master bath, change of direction of main staircase, elimination of 6" steps up to master bathroom. eliminate back stairs & add railing to the new door. | $2,000 |
| Jul 30, 2014 | Completed final sign-off May 2015 | 3822 19th St | remodel apts 1 & 5; new cabinets counters appliances in kitchen, remove kit soffit, remodel (e) baths, all walls type "x" gyp, bd, 5/8 to keep, 1-hr walls throughout, non structural partition work only, no alteration of wall window & door.Details
remodel apts 1 & 5; new cabinets counters appliances in kitchen, remove kit soffit, remodel (e) baths, all walls type "x" gyp, bd, 5/8 to keep, 1-hr walls throughout, non structural partition work only, no alteration of wall window & door. | $54,000 |
| Apr 30, 2014 | Completed final sign-off Feb 2015 | 1615 Lyon St | 3 baths, remove and replace fixtures in kind, no structural work, no wall modification and no new walls electrical and plumbing- under separate permmitDetails
3 baths, remove and replace fixtures in kind, no structural work, no wall modification and no new walls electrical and plumbing- under separate permmit | $78,000 |
| Apr 28, 2014 | Completed final sign-off Mar 2015 | 999 Green St | work in common area: interior remodel of (e) lobby on ground floor. work includes (n) lighting, partitions, fixtures, finishes, remodel of (e) bathroom. ext. floor finishes within property line. also minor remodel of (e) elevator lobbies on parking levels 2, 4, and 6.Details
work in common area: interior remodel of (e) lobby on ground floor. work includes (n) lighting, partitions, fixtures, finishes, remodel of (e) bathroom. ext. floor finishes within property line. also minor remodel of (e) elevator lobbies on parking levels 2, 4, and 6. | $200,000 |
| Apr 3, 2014 | Completed final sign-off Mar 2017 | 21 San Pablo Av | rear extension of (e) sun room (+-7'-0"). including (n) wood windows & doors, and skylight. remodel (e) kitchen including the addition of four (n) wood windows. remodel firest & second floor baths. replace (e) furnace no change to front facade.Details
rear extension of (e) sun room (+-7'-0"). including (n) wood windows & doors, and skylight. remodel (e) kitchen including the addition of four (n) wood windows. remodel firest & second floor baths. replace (e) furnace no change to front facade. | $95,000 |
| Aug 6, 2013 | Completed final sign-off Oct 2014 | 36 Divisadero St | 1) install a new interior circular stair connecting the 1st floor with basement. 2)remodel extg space into a studio/familiy room with office and bathroom/laundry room.new doors with steps with access to rear yard and new windows. 3) new passageway within extg 2 car garage on ground floor to the strtDetails
1) install a new interior circular stair connecting the 1st floor with basement. 2)remodel extg space into a studio/familiy room with office and bathroom/laundry room.new doors with steps with access to rear yard and new windows. 3) new passageway within extg 2 car garage on ground floor to the strt | $68,000 |
| Jul 12, 2013 | Completed final sign-off Feb 2014 | 371 Banks St | remove (e) partitions at first floor, renovation & addition to (e) 2nd floor, additoin icludes (2) new dormers, housing new bathroom & closet spaces.Details
remove (e) partitions at first floor, renovation & addition to (e) 2nd floor, additoin icludes (2) new dormers, housing new bathroom & closet spaces. | $40,000 |
| May 30, 2013 | Completed final sign-off Nov 2013 | 3452 Jackson St | renovation 2 baths, remove 2 rear windows and replace one window. add master closet and millwork. windows not visible from the street.Details
renovation 2 baths, remove 2 rear windows and replace one window. add master closet and millwork. windows not visible from the street. | $150,000 |
| May 24, 2013 | Completed final sign-off Nov 2013 | 555 Dewey Bl | remodel kitchen & remove 1/2 bath downstairs. convert 2 upstairs closets to split bathroom. add windows to kitchen.Details
remodel kitchen & remove 1/2 bath downstairs. convert 2 upstairs closets to split bathroom. add windows to kitchen. | $75,000 |
| Nov 20, 2012 | Completed final sign-off Feb 2013 | 739 Lake St | interior alterations of finishes, cabinetry, plumbing, appliances on upper levels including kitchen, family rm, master bath, master bedroom, laundry, bath & bedrooms. re-flooring top floor & providing wash-up sink. no changes to walls or square footage. repairing (e) decking in kind less than 50%.Details
interior alterations of finishes, cabinetry, plumbing, appliances on upper levels including kitchen, family rm, master bath, master bedroom, laundry, bath & bedrooms. re-flooring top floor & providing wash-up sink. no changes to walls or square footage. repairing (e) decking in kind less than 50%. | $25,000 |
| Oct 19, 2012 | Completed final sign-off Apr 2013 | 1362 Vallejo St | renovate kitchen and update 2 bathrooms. kitchen changes include new cabinets, add island, remove dividing wall to open space. master bath includes converting a bath/shower to shower and putting new tile and vanity. 2nd bath at entry replace tile and bath.Details
renovate kitchen and update 2 bathrooms. kitchen changes include new cabinets, add island, remove dividing wall to open space. master bath includes converting a bath/shower to shower and putting new tile and vanity. 2nd bath at entry replace tile and bath. | $130,000 |
| Jul 6, 2012 | Completed final sign-off Aug 2013 | 2841 Filbert St | revisions to pa 200906190806 & 201202234750 to remove 2 windows. minor changes to window and door sizes. new reduction of 75 sq. ft. glazing. relocate bathroom in master suite.Details
revisions to pa 200906190806 & 201202234750 to remove 2 windows. minor changes to window and door sizes. new reduction of 75 sq. ft. glazing. relocate bathroom in master suite. | |
| Apr 20, 2012 | Completed final sign-off Dec 2012 | 34 Wawona St | work is the interior remodel of the (e) kitchen & master bedroom/bathroom & the addition of a rear deck. there is no work on the front of the houseDetails
work is the interior remodel of the (e) kitchen & master bedroom/bathroom & the addition of a rear deck. there is no work on the front of the house | $150,000 |
| Apr 17, 2012 | Completed final sign-off Aug 2012 | 148 Jordan Av | convert 270 sqft of unheated basement storage to heated storage, remodel 2 bathrooms @ the 2nd story. replace 4 windows.Details
convert 270 sqft of unheated basement storage to heated storage, remodel 2 bathrooms @ the 2nd story. replace 4 windows. | $12,500 |
| Mar 23, 2012 | Completed final sign-off Mar 2014 | 68 Presidio Av | revision to pa# 201201182486, expand existing garage and extend stair and elevator to gargage level. add 1 bedroom and bath.Details
revision to pa# 201201182486, expand existing garage and extend stair and elevator to gargage level. add 1 bedroom and bath. | $125,000 |
| Jan 18, 2012 | Completed final sign-off Mar 2014 | 68 Presidio Av | remodel kitchen & 4-(e) bathrooms, add one bath room provide new windows & misc. interior improvements. and new elevator.Details
remodel kitchen & 4-(e) bathrooms, add one bath room provide new windows & misc. interior improvements. and new elevator. | $185,000 |
| Sep 29, 2011 | Completed final sign-off Jan 2012 | 175 San Leandro Wy | remodel master bath at second floor. no structural work and no wall relocation. permanently installed lights in bathroom shall be high efficacy unless they are controlled by manual on occupancy sensors - cec 150(k)10.Details
remodel master bath at second floor. no structural work and no wall relocation. permanently installed lights in bathroom shall be high efficacy unless they are controlled by manual on occupancy sensors - cec 150(k)10. | $25,000 |
| Aug 23, 2011 | Completed final sign-off Mar 2012 | 10 Miller Pl | relocate partitions wall. replace kitchen cabinets. replace bath vanities & showers. new hardwood flooring. new tile floor at baths. accessible features existing will have to be maintained per 11a for building built after 1991 per 1102a.2Details
relocate partitions wall. replace kitchen cabinets. replace bath vanities & showers. new hardwood flooring. new tile floor at baths. accessible features existing will have to be maintained per 11a for building built after 1991 per 1102a.2 | $100,000 |
| Mar 4, 2011 | Never finaled issued Mar 2011, no final | 2910 Vallejo St | remodel master suite. add closet, infill door at bath#5. replace tile at bath #6 at 2nd floor. no structural work.Details
remodel master suite. add closet, infill door at bath#5. replace tile at bath #6 at 2nd floor. no structural work. | $35,000 |
| Dec 30, 2010 | Completed final sign-off Jun 2011 | 1980 08th Av | renovate master bath, master bedroom, replace plaster finish with drwyall, add 3 ea. storage closets, replace (e) dodor to bath w/ a pocket door throughout master suite - replace single pane windows w/ double pane windows.Details
renovate master bath, master bedroom, replace plaster finish with drwyall, add 3 ea. storage closets, replace (e) dodor to bath w/ a pocket door throughout master suite - replace single pane windows w/ double pane windows. | $53,000 |
| Jun 18, 2010 | Completed final sign-off Jul 2010 | 4518 25th St | revision to pa# 2010.0412.0107. add w/d to inside " as bulit" bathroom @ 3rd floor. remove sprinkler requirement @ garage based on previously approved removal of 2nd exit thru garage.Details
revision to pa# 2010.0412.0107. add w/d to inside " as bulit" bathroom @ 3rd floor. remove sprinkler requirement @ garage based on previously approved removal of 2nd exit thru garage. | |
| Feb 4, 2010 | Completed final sign-off Nov 2010 | 714 27th St | new kitchen cabinets, relocate master bath gr floor, partial window replacment (inserts), new mster closet, new av/storage closet. no structural workDetails
new kitchen cabinets, relocate master bath gr floor, partial window replacment (inserts), new mster closet, new av/storage closet. no structural work | $125,000 |
| Oct 15, 2009 | Completed final sign-off Feb 2010 | 222 El Camino Del Mar | interior alterations to 3rd floor office-convert office to 2 bedrooms & 1 bathroom relocation. interior work only.Details
interior alterations to 3rd floor office-convert office to 2 bedrooms & 1 bathroom relocation. interior work only. | $14,000 |
| Jul 30, 2009 | Completed final sign-off Oct 2009 | 1980 08th Av | bathroom remodel. children's bathroom, change tile, vanity, bathroom fixtures, lighting fixturesDetails
bathroom remodel. children's bathroom, change tile, vanity, bathroom fixtures, lighting fixtures | $10,000 |
| Feb 24, 2009 | Completed final sign-off Aug 2009 | 83 Wawona St | remodel garage, add 2 rooms and a bathroom. no structural work needed.Details
remodel garage, add 2 rooms and a bathroom. no structural work needed. | $35,000 |
| Mar 18, 2008 | Completed final sign-off Jan 2009 | 3325 Jackson St | removal of an (e) wood burning fireplace and replacement with a new gas powered (insert) fireplace on 1st floor. bathroom renovations to 2 (e) bathrooms on 2nd floor including new fixtures and finishesDetails
removal of an (e) wood burning fireplace and replacement with a new gas powered (insert) fireplace on 1st floor. bathroom renovations to 2 (e) bathrooms on 2nd floor including new fixtures and finishes | $50,000 |
| Jan 17, 2007 | Expired or cancelled expired Oct 2009 | 1122 Green St | interior remodel of selected bathrooms on 2nd and 3rd level. replacement of toilets and sinks. flourescent lightingDetails
interior remodel of selected bathrooms on 2nd and 3rd level. replacement of toilets and sinks. flourescent lighting | $8,000 |
| Nov 24, 2004 | Completed final sign-off Dec 2004 | 140 San Fernando Wy | replace tile and bath vanity, ground flr bathDetails
replace tile and bath vanity, ground flr bath | $3,000 |
| Oct 25, 2004 | Completed final sign-off May 2005 | 651 27th St | relocte bath of master suite. relocate laundry facilities to garage. remodel guest bath.Details
relocte bath of master suite. relocate laundry facilities to garage. remodel guest bath. | $50,000 |
| Jun 23, 2003 | Completed final sign-off Jun 2004 | 1601 Monterey Bl | kitchen remodel, master bath remodel (no exterior work)Details
kitchen remodel, master bath remodel (no exterior work) | $75,000 |