Back to bathroom remodel contractors
Carmel Construction Inc
- Based in
- Carmel
- On San Francisco permits
- Nov 2018 to Jan 2022
- Last 24 months
- 0 permits filed
13 permits since 2000: 11 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 8 completed, 2 never finaled. Typically 3 days from filing to permit and 87 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 7, 2022 | Completed final sign-off Mar 2022 | 1221 Funston Av | unit c106: install new laundry closets. repair kitchen and bath cabinets. upgrade electrical to code, add electrical and plumbing for washer and dryer.Details
unit c106: install new laundry closets. repair kitchen and bath cabinets. upgrade electrical to code, add electrical and plumbing for washer and dryer. | $30,000 |
| Nov 19, 2021 | Completed final sign-off Feb 2022 | 1240 14th Av | unit d301: replace kitchen and bath cabinets, tops, fixtures upgrades. electical to code & add electrical and plumbing for washer & dryer. frame closet for w/d.Details
unit d301: replace kitchen and bath cabinets, tops, fixtures upgrades. electical to code & add electrical and plumbing for washer & dryer. frame closet for w/d. | $30,000 |
| Oct 26, 2021 | Completed final sign-off Jan 2022 | 1201 Funston Av | unit # b306: replace kitchen + bath cabinets/ tops/ fixtures upgrade electricalto code + add electrical + plumbing for washer + dryer + frame closet for w/d.Details
unit # b306: replace kitchen + bath cabinets/ tops/ fixtures upgrade electricalto code + add electrical + plumbing for washer + dryer + frame closet for w/d. | $30,000 |
| Apr 21, 2021 | Completed final sign-off Aug 2021 | 1200 14th Av | change out kitchen/bath cabinets, add washier and dryer in closet, add plumbing and electrical for washer and dryerDetails
change out kitchen/bath cabinets, add washier and dryer in closet, add plumbing and electrical for washer and dryer | $20,000 |
| Apr 21, 2021 | Completed final sign-off Aug 2021 | 1221 Funston Av | unit c-108: change out kitchen and bathroom cabinets. add washer and dryer in closet. add plumbing and electrical for washer and dryer.Details
unit c-108: change out kitchen and bathroom cabinets. add washer and dryer in closet. add plumbing and electrical for washer and dryer. | $20,000 |
| Aug 18, 2020 | Never finaled issued Aug 2020, no final | 1200 14th Av | unit #a203: add new washer/dryer(ventless)with plumbing in a reconfigured (interior shelving only) closet. replace all cabinets/countertops/sinks/faucets/light fixtures in kitchen and bathroom (~150 sq ft). all work in kind.Details
unit #a203: add new washer/dryer(ventless)with plumbing in a reconfigured (interior shelving only) closet. replace all cabinets/countertops/sinks/faucets/light fixtures in kitchen and bathroom (~150 sq ft). all work in kind. | $30,000 |
| Jan 7, 2020 | Completed final sign-off Aug 2020 | 301 Church St | frame new handicap bath and dividing wall and ceiling. frame for new barn doors and new closet, install new cabinest / countertops and fixtures, plumb for new bath and new shower, new w/d, electric for new panel, new heat pumpDetails
frame new handicap bath and dividing wall and ceiling. frame for new barn doors and new closet, install new cabinest / countertops and fixtures, plumb for new bath and new shower, new w/d, electric for new panel, new heat pump | $35,000 |
| Sep 10, 2019 | Completed final sign-off Oct 2019 | 1200 14th Av | unit a106: replace kitchen & bath carinets, tops, fixtures, upgrade ele to code & add electrical & plumbing for new washer & dryer frame new closet for wahser dryerDetails
unit a106: replace kitchen & bath carinets, tops, fixtures, upgrade ele to code & add electrical & plumbing for new washer & dryer frame new closet for wahser dryer | $30,000 |
| Jun 6, 2019 | Never finaled issued Jun 2019, no final | 1240 14th Av | unit d203: replace kitchen and bath cabinets, tops, fixtures upgrade elec to code & add elec and plumbing for washer & dryer & frame closet for w/dDetails
unit d203: replace kitchen and bath cabinets, tops, fixtures upgrade elec to code & add elec and plumbing for washer & dryer & frame closet for w/d | $30,000 |
| Dec 14, 2018 | Completed final sign-off Jul 2019 | 1201 Funston Av | unit b202-change out kitchen and bath cabinets and tops and fixtures. upgrade ele to code add ele and plm for w/d and frame for w/dDetails
unit b202-change out kitchen and bath cabinets and tops and fixtures. upgrade ele to code add ele and plm for w/d and frame for w/d | $20,000 |