Cardona Construction
- Based in
- Richmond
- On San Francisco permits
- Apr 2003 to May 2022
- Last 24 months
- 0 permits filed
25 permits since 2000: 12 completed, 4 never finaled, 9 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 expired or cancelled. Typically 168 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 14, 2011 | Expired or cancelled cancelled Jan 2026 | 2731 Golden Gate Av | replace existing wood stair, expand existing deck at rearDetails
replace existing wood stair, expand existing deck at rear | $12,000 |
| Dec 21, 2006 | Expired or cancelled expired Feb 2009 | 437 Chenery St | repair fire damage to structure- exist layout to remain,replace sheetrock &insulation,new windows in (e) opening,rebuild rear deck,replace plumbing fixtures,elec fixtures.scope of work is limited to repairing fire damage to interior finishes at the uppermost story and a portion of the rear deck.Details
repair fire damage to structure- exist layout to remain,replace sheetrock &insulation,new windows in (e) opening,rebuild rear deck,replace plumbing fixtures,elec fixtures.scope of work is limited to repairing fire damage to interior finishes at the uppermost story and a portion of the rear deck. | $45,000 |