Back to bathroom remodel contractors
Cardenas Custom Builders Inc.
- Based in
- Hayward
- On San Francisco permits
- Nov 2017 to Sep 2026
- Last 24 months
- 10 permits filed
40 permits since 2000: 29 completed, 3 in progress, 3 never finaled, 5 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 14 completed, 2 in progress, 1 never finaled, 2 expired or cancelled. Typically 79 days from filing to permit and 236 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 4, 2026 | In progress issued Sep 2026 | 537 Steiner St | unit 537: 3 bathroom remodels in kind, 1 main, 1 powder room, 1 bedroom bathroom. replace existing plumbing and electrical in kind. no tub coversions, new tiles, new drywall, insulation and paint. kitchen remodel, new cabinets, drywall, counter tops, backsplash, work in kind. laundry room, replaceDetails
unit 537: 3 bathroom remodels in kind, 1 main, 1 powder room, 1 bedroom bathroom. replace existing plumbing and electrical in kind. no tub coversions, new tiles, new drywall, insulation and paint. kitchen remodel, new cabinets, drywall, counter tops, backsplash, work in kind. laundry room, replace | $120,000 |
| Nov 12, 2025 | Completed final sign-off Mar 2026 | 221 Arbor St | bathroom remodel in kind. new tiles, paint, vanity, plumbing and electrical. no change to floor layout. no change to wall layout. no structural work.Details
bathroom remodel in kind. new tiles, paint, vanity, plumbing and electrical. no change to floor layout. no change to wall layout. no structural work. | $25,000 |
| Sep 16, 2025 | Completed final sign-off May 2026 | 4156 Folsom St | 1st floor: alteration two footing for new posts. 2nd floor: bath, kitchen, dining & living room renovation. roof:new skylight. total of two buildg 9n) 1 hr fire resistance rated parapet.Details
1st floor: alteration two footing for new posts. 2nd floor: bath, kitchen, dining & living room renovation. roof:new skylight. total of two buildg 9n) 1 hr fire resistance rated parapet. | $75,000 |
| Aug 19, 2025 | In progress issued Jun 2026 | 1406 Diamond St | 3/f vertical addition. 1/f: (n) entry.2/f: interior renovations (dining/living). (n) 3/f: 2 beds, 1 bath, 1 sitting rm. new int stairs connect 1/2/3. rear yd: new site stair connection 1/f to 2/f rear yard.Details
3/f vertical addition. 1/f: (n) entry.2/f: interior renovations (dining/living). (n) 3/f: 2 beds, 1 bath, 1 sitting rm. new int stairs connect 1/2/3. rear yd: new site stair connection 1/f to 2/f rear yard. | $400,000 |
| Jul 29, 2025 | Completed final sign-off Mar 2026 | 221 Arbor St | replace in-kind 14 (e) windows and 1 door at (e) r/o. replace front of house w/new wood siding & trim. replace in-kind both sides of house w/new siding & new trim. replace in-kind (e) roof membrane by code. replace in-kind 2 (e) skylights at (e) r/o. remodel one bathroom on second floor in kind.Details
replace in-kind 14 (e) windows and 1 door at (e) r/o. replace front of house w/new wood siding & trim. replace in-kind both sides of house w/new siding & new trim. replace in-kind (e) roof membrane by code. replace in-kind 2 (e) skylights at (e) r/o. remodel one bathroom on second floor in kind. | $180,000 |
| Jul 2, 2025 | Completed final sign-off Mar 2026 | 208 Moultrie St | convert part of garage level to add 1 family room and one office. convert powder room into full bathroom. install patio door & window in the rear facade.Details
convert part of garage level to add 1 family room and one office. convert powder room into full bathroom. install patio door & window in the rear facade. | $40,000 |
| Jan 31, 2025 | Completed final sign-off Aug 2025 | 58 Gladys St | bathroom remodel in kind replace in kind shower toilet sink cieling lights scones, gfi, and plumbing. replace (e) window in kind not visible from street. install (n) drywall, tiles and paint.Details
bathroom remodel in kind replace in kind shower toilet sink cieling lights scones, gfi, and plumbing. replace (e) window in kind not visible from street. install (n) drywall, tiles and paint. | $26,000 |
| Oct 25, 2024 | Completed final sign-off Aug 2025 | 321 Clipper St | interior bathroom renovation & new powder room (front building)Details
interior bathroom renovation & new powder room (front building) | $15,000 |
| Aug 7, 2023 | Never finaled issued Aug 2023, no final | 449 Nevada St | revision to pa# 202111303281 to document as builts for changes in basement: show wine storage, room & steps; main flr: show pantry & bath locations swapped, add shower in bath; top/flr: master bath fixtures relocated. eliminate wic in master bedroom. office in wic.Details
revision to pa# 202111303281 to document as builts for changes in basement: show wine storage, room & steps; main flr: show pantry & bath locations swapped, add shower in bath; top/flr: master bath fixtures relocated. eliminate wic in master bedroom. office in wic. | $1,000 |
| Apr 6, 2022 | Completed final sign-off Dec 2022 | 251 Bartlett St | unit a: replace in-kind 2 bathrooms with new washer & dryer. replace in-kind new kitchen. new electrical for bathrooms, kitchen, hallway, dining & living room ceilings. new wood floor throughout. replace interior doors. 2 new benches on chimney. new decor for fireplace. paint.Details
unit a: replace in-kind 2 bathrooms with new washer & dryer. replace in-kind new kitchen. new electrical for bathrooms, kitchen, hallway, dining & living room ceilings. new wood floor throughout. replace interior doors. 2 new benches on chimney. new decor for fireplace. paint. | $160,000 |
| Nov 30, 2021 | Completed final sign-off Aug 2023 | 449 Nevada St | develop 1st fl accessory rms.(fam & exer), new bath,relocate laundry,furn,w/d.new patio doors to yard. add powder rm 2nd fl.rmdl kitchen,pantry, office areas.relocate m bath 3rd fl. convert old bath to office. add wic.2 new skylights.escavate <50% cu yd for new lower slabs to gain 7'6 min headrmDetails
develop 1st fl accessory rms.(fam & exer), new bath,relocate laundry,furn,w/d.new patio doors to yard. add powder rm 2nd fl.rmdl kitchen,pantry, office areas.relocate m bath 3rd fl. convert old bath to office. add wic.2 new skylights.escavate <50% cu yd for new lower slabs to gain 7'6 min headrm | $117,218 |
| Mar 31, 2021 | Completed final sign-off Dec 2023 | 14 Winfield St | improvements consist of reconfiguring 2 extg bathrooms and closets. the siding on the back of the house will be repaired as needed. the 2 decks in the rear yard will be repaired not to exceed 50%.Details
improvements consist of reconfiguring 2 extg bathrooms and closets. the siding on the back of the house will be repaired as needed. the 2 decks in the rear yard will be repaired not to exceed 50%. | $105,000 |
| Oct 22, 2020 | Expired or cancelled expired Jul 2025 | 144 Bonview St | vertical & rear horizontal addition.ref. variance: 2019-002916env1st: (n) beds, bath, stor.2nd: (n) beds, bath & rear deck3rd: (n) bed, bath, auxiliary, laund, & gara.. rear deck4th: (n) kit, pwdr, living, dining & bay window @ front. rear deckrear yard: (n) terrace & plantersprinkler bldgDetails
vertical & rear horizontal addition.ref. variance: 2019-002916env1st: (n) beds, bath, stor.2nd: (n) beds, bath & rear deck3rd: (n) bed, bath, auxiliary, laund, & gara.. rear deck4th: (n) kit, pwdr, living, dining & bay window @ front. rear deckrear yard: (n) terrace & plantersprinkler bldg | $250,000 |
| Sep 4, 2020 | Expired or cancelled expired Apr 2025 | 712 Cole St | add new habitable space, office room and full bathroom behind the garage at the ground floor. replace existing water heater and furnace. structural work: replace posts & beams, add new foundation. fill in underneath 2nd story at the rear, less than 10' in height.Details
add new habitable space, office room and full bathroom behind the garage at the ground floor. replace existing water heater and furnace. structural work: replace posts & beams, add new foundation. fill in underneath 2nd story at the rear, less than 10' in height. | $90,000 |
| Jun 3, 2020 | Completed final sign-off Mar 2022 | 2970 21st St | remodel storage space into one bedroom, 2 baths connect 3rd level to 4th level with interior staircase. sprinkler system plans will be submitted by fire prevention contractor.Details
remodel storage space into one bedroom, 2 baths connect 3rd level to 4th level with interior staircase. sprinkler system plans will be submitted by fire prevention contractor. | $85,000 |
| Oct 10, 2019 | Completed final sign-off Apr 2025 | 712 Cole St | int. remodel of kitchens and bathrooms in 2 units, add laundry nooks. 1/f - build new storage; 2/f conver dining/living room into master bedroom, add 1/2 bathroom; replace 1 window, add 1 slider door. 3/f remove (e) closet to make (e) bedroom larger. add 1 slider door.Details
int. remodel of kitchens and bathrooms in 2 units, add laundry nooks. 1/f - build new storage; 2/f conver dining/living room into master bedroom, add 1/2 bathroom; replace 1 window, add 1 slider door. 3/f remove (e) closet to make (e) bedroom larger. add 1 slider door. | $75,000 |
| Oct 8, 2019 | Completed final sign-off Jun 2020 | 438 Scott St | renovation of unit #438 at the 2nd fl to include adding a new bathroom & in-unit laundry within the existing flat; replaacement of fixtures & finishes at existing kitchen & bath; replace kitchen windows at rear.Details
renovation of unit #438 at the 2nd fl to include adding a new bathroom & in-unit laundry within the existing flat; replaacement of fixtures & finishes at existing kitchen & bath; replace kitchen windows at rear. | $75,000 |
| Jun 3, 2019 | Completed final sign-off Mar 2022 | 174 Bocana St | vertical addition @ attic level into master bedroom & master bathroom. remodel of interiors @ 1st levelDetails
vertical addition @ attic level into master bedroom & master bathroom. remodel of interiors @ 1st level | $135,000 |
| May 28, 2019 | Completed final sign-off Aug 2019 | 765 Teresita Bl | 2nd flr -remodel bathroom in-kind, like for like. replace skylight.Details
2nd flr -remodel bathroom in-kind, like for like. replace skylight. | $12,000 |