Cardea Bldg Dba Dimension Design Group
- Based in
- Oakland
- On San Francisco permits
- Aug 2005 to May 2026
- Last 24 months
- 8 permits filed
136 permits since 2000: 110 completed, 4 in progress, 14 never finaled, 8 expired or cancelled.
Of the 14 never-finaled permits, 5 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
4 roof deck permits: 4 completed. Typically 10 days from filing to permit and 374 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 24, 2023 | Completed final sign-off Feb 2025 | 154 15th Av | front of bldg only: 1) expand roof deck @ 2nd flr & replace exterior stairs; 2) @ 2nd flr replace & enlarge sliding door from dining rm to deck; 3) @ 4th flr turn unoccupied roof into new roof deck; 4) new window & exterior door @ 4th flr bedrm; 5) remodel bathroom @ 4th flr.Details
front of bldg only: 1) expand roof deck @ 2nd flr & replace exterior stairs; 2) @ 2nd flr replace & enlarge sliding door from dining rm to deck; 3) @ 4th flr turn unoccupied roof into new roof deck; 4) new window & exterior door @ 4th flr bedrm; 5) remodel bathroom @ 4th flr. | $60,000 |
| Apr 25, 2018 | Completed final sign-off Apr 2019 | 3 Bennington St | replace door to roof deck in kind, not visible from street. repair leaks at front stairs and front windowDetails
replace door to roof deck in kind, not visible from street. repair leaks at front stairs and front window | $5,000 |
| Apr 4, 2014 | Completed final sign-off Dec 2015 | 213 Douglass St | 1st floor - horiz. addition approx 13'9", remodel (e) living room. 2nd floor horiz. addition approx 1'7", remodel (e) bedroom. 3rd floor horiz addition approx. 1'7" plus roof deck, remodel (e) bedroom.Details
1st floor - horiz. addition approx 13'9", remodel (e) living room. 2nd floor horiz. addition approx 1'7", remodel (e) bedroom. 3rd floor horiz addition approx. 1'7" plus roof deck, remodel (e) bedroom. | $75,000 |
| May 17, 2011 | Completed final sign-off Feb 2012 | 2760 Broderick St | work on unit at 2760 broderick. kitchen remodel. master bath remodel. two new skylights. replace/move door to roof deck. two new windows. replace 2 windows. move laundry to powder rm, remove powder roomDetails
work on unit at 2760 broderick. kitchen remodel. master bath remodel. two new skylights. replace/move door to roof deck. two new windows. replace 2 windows. move laundry to powder rm, remove powder room | $120,000 |