Back to bathroom remodel contractors
Capital Design Builders
- Based in
- San Francisco
- On San Francisco permits
- Jun 2001 to Jul 2014
- Last 24 months
- 0 permits filed
28 permits since 2000: 17 completed, 2 never finaled, 9 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
7 bathroom remodel permits: 4 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 354 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 12, 2013 | Completed final sign-off Mar 2015 | 2063 Green St | add 1 (n) bathroom at 3/f and remodel 1 bathroom at 2/f. provide fan and led lights for 2nd floor bathroom. remodel also. replace window with factor of u-factor 0.4Details
add 1 (n) bathroom at 3/f and remodel 1 bathroom at 2/f. provide fan and led lights for 2nd floor bathroom. remodel also. replace window with factor of u-factor 0.4 | $60,000 |
| Aug 2, 2011 | Completed final sign-off Oct 2011 | 4135 Judah St | remodel rear portion of 3rd floor including bathroom, enlarge opening at 2nd floor between dining rm and kitchen. replace 4 alum windows with 2 egress legal dbl hung in same location 3rd fl. in-fill 3rd floor bathroom window.Details
remodel rear portion of 3rd floor including bathroom, enlarge opening at 2nd floor between dining rm and kitchen. replace 4 alum windows with 2 egress legal dbl hung in same location 3rd fl. in-fill 3rd floor bathroom window. | $35,000 |
| Mar 26, 2010 | Completed final sign-off May 2011 | 2675 16th Av | remodel of entire 1st floor level (garage level), add (1) full bathroom, storage room, hall, laundry room, enclosed garage area & (1) great room. 2nd floor insulate top level ceilings around 500 sf & reroute heat ducts/vents.Details
remodel of entire 1st floor level (garage level), add (1) full bathroom, storage room, hall, laundry room, enclosed garage area & (1) great room. 2nd floor insulate top level ceilings around 500 sf & reroute heat ducts/vents. | $175,000 |
| Oct 10, 2007 | Never finaled issued Oct 2007, no final | 345 Santiago St | revisions to p.a.200706133848. add new framing to support new 3rd floor bathroom floor.Details
revisions to p.a.200706133848. add new framing to support new 3rd floor bathroom floor. | $6,500 |
| Jun 13, 2007 | Expired or cancelled expired Mar 2009 | 345 Santiago St | remodel 3rd stoy bathroom/closet & remodel garge level area approx 650 sf , all interior work 100%Details
remodel 3rd stoy bathroom/closet & remodel garge level area approx 650 sf , all interior work 100% | $185,000 |
| Apr 21, 2006 | Completed final sign-off Feb 2007 | 1508 Leavenworth St | replace rough plumbing (abs) install new tub and tile surround and floor in 2nd flat #1508. (1) bath remodel no structural work. hwh replace ment for building (1 unit) fixture.Details
replace rough plumbing (abs) install new tub and tile surround and floor in 2nd flat #1508. (1) bath remodel no structural work. hwh replace ment for building (1 unit) fixture. | $9,000 |
| May 26, 2004 | Expired or cancelled expired Nov 2015 | 2148 Sutter St | create master bathroom in existing living space at 4th floorDetails
create master bathroom in existing living space at 4th floor | $40,000 |