Camex Electric & Builders
- Based in
- San Mateo
- On San Francisco permits
- Jun 2022 to Jun 2024
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 25, 2024 | Completed final sign-off Aug 2024 | 222 Lexington St | rev to pa#2024-0220-6146. additional work: new countertops, kitchen sink, upgrade sub panel from 70 to 90 amps, new 2401i5va, 240140va, replaced dishwasher, fridge 120115va for heater warmer,Details
rev to pa#2024-0220-6146. additional work: new countertops, kitchen sink, upgrade sub panel from 70 to 90 amps, new 2401i5va, 240140va, replaced dishwasher, fridge 120115va for heater warmer, | |
| Feb 20, 2024 | In progress issued Feb 2024 | 222 Lexington St | tile, replace shower valve and new hot mop. replace toilet and sink. exhaust fan replacement. no wall changeDetails
tile, replace shower valve and new hot mop. replace toilet and sink. exhaust fan replacement. no wall change | $12,000 |
| Jun 30, 2022 | Completed final sign-off Sep 2022 | 109 Wilmot St | unit 115: add 4 dedicated circuits and repair some of the 2x4 studs at kitchen. up grade to 200a service.Details
unit 115: add 4 dedicated circuits and repair some of the 2x4 studs at kitchen. up grade to 200a service. | $4,350 |