Calvin Lam Electric Const
- Based in
- San Francisco
- On San Francisco permits
- Jun 2007 to Nov 2015
- Last 24 months
- 0 permits filed
10 permits since 2000: 9 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 2, 2015 | Completed final sign-off Jan 2016 | 336 12th Av | add resilent channel and sheetrock under existing sheetrock, 5/8" type x sheetrock.Details
add resilent channel and sheetrock under existing sheetrock, 5/8" type x sheetrock. | $1,800 |
| May 3, 2011 | Completed final sign-off May 2011 | 8 16th Av | to obtain final inspection for work approved under pa#200801182813 all work is complete.Details
to obtain final inspection for work approved under pa#200801182813 all work is complete. | |
| May 3, 2011 | Completed final sign-off May 2011 | 8 16th Av | to obtain final inspection for work approved under pa#200803177273 all work is complete.Details
to obtain final inspection for work approved under pa#200803177273 all work is complete. | |
| May 3, 2011 | Completed final sign-off May 2011 | 8 16th Av | to obtain final inspection for work approved under pa#200706204607 all work is complete.Details
to obtain final inspection for work approved under pa#200706204607 all work is complete. | |
| May 3, 2011 | Completed final sign-off May 2011 | 8 16th Av | to obtain final inspection for work approved under pa#200803217732 all work is complete.Details
to obtain final inspection for work approved under pa#200803217732 all work is complete. | |
| Feb 9, 2010 | Completed final sign-off Apr 2011 | 8 16th Av | repair bathroom leak, upgrade electrical in kitchen, repair dry rot, repair windows on back of buildingDetails
repair bathroom leak, upgrade electrical in kitchen, repair dry rot, repair windows on back of building | $4,500 |
| Feb 9, 2010 | Completed final sign-off Jul 2010 | 1370 Funston Av | bathroom remodel & fix sheetrockDetails
bathroom remodel & fix sheetrock | $3,000 |
| Dec 3, 2009 | Completed final sign-off Jan 2010 | 336 12th Av | rear bldg - convert (e) living room to study room on 2nd floor. divide play rm. into study rm & play rm. @ 1st. flr.Details
rear bldg - convert (e) living room to study room on 2nd floor. divide play rm. into study rm & play rm. @ 1st. flr. | $2,500 |
| Dec 3, 2009 | Completed final sign-off Nov 2010 | 338 12th Av | front bldg-remove a (e) window & install with a new 3' x 6'-8" door on ground floor utility room lead to alley walkway.Details
front bldg-remove a (e) window & install with a new 3' x 6'-8" door on ground floor utility room lead to alley walkway. | $450 |
| Jun 20, 2007 | Never finaled issued Jun 2007, no final | 8 16th Av | structural strenghening to basement foundation, voluntary strenthening. tying back existing retaining wall that forms northern side of building foundation. provide temp shoring as requiredDetails
structural strenghening to basement foundation, voluntary strenthening. tying back existing retaining wall that forms northern side of building foundation. provide temp shoring as required | $28,500 |