Back to bathroom remodel contractors
Calvin Chan Constr Inc. **See Note **
- Based in
- San Jose
- On San Francisco permits
- Nov 2005 to Sep 2022
- Last 24 months
- 0 permits filed
30 permits since 2000: 26 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 12 completed. Typically 0 days from filing to permit and 136 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 8, 2022 | Completed final sign-off Nov 2022 | 3828 Sacramento St | unit 2: repair (e) bath tub, toilet, basin, exhaust fan, patch/replace tile & drywallDetails
unit 2: repair (e) bath tub, toilet, basin, exhaust fan, patch/replace tile & drywall | $10,500 |
| Jan 4, 2019 | Completed final sign-off Jun 2019 | 27 Sweeny St | remodel two bathrooms and upgrade electrical main panel. 5x8 eachDetails
remodel two bathrooms and upgrade electrical main panel. 5x8 each | $18,000 |
| Mar 17, 2017 | Completed final sign-off Nov 2018 | 1346 27th Av | construct two bedrooms, one half bathroom, & family room @ ground floor. relocate kitchen & dining room. construct one half bathroom at 2nd floor. remove existing foundation, replace w/new & new post at ground floor.Details
construct two bedrooms, one half bathroom, & family room @ ground floor. relocate kitchen & dining room. construct one half bathroom at 2nd floor. remove existing foundation, replace w/new & new post at ground floor. | $70,000 |
| Dec 9, 2016 | Completed final sign-off May 2017 | 2 Vesta St | revision to app#201509237900/r-2, modify lower floor bathrooms configuration by relocate a non-structural partition wall, bathroom sink and replace bathtub with a shower pan. shift a fire rated door from center to side.Details
revision to app#201509237900/r-2, modify lower floor bathrooms configuration by relocate a non-structural partition wall, bathroom sink and replace bathtub with a shower pan. shift a fire rated door from center to side. | $2,000 |
| Dec 1, 2016 | Completed final sign-off May 2017 | 427 Randolph St | interior remodel: add one bedroom & one family room and two bathrooms @ ground floor. remodel (e)kitchen @ 2nd flr, add one new bedroom,one new bath @2nd flr.Details
interior remodel: add one bedroom & one family room and two bathrooms @ ground floor. remodel (e)kitchen @ 2nd flr, add one new bedroom,one new bath @2nd flr. | $40,000 |
| Jul 19, 2016 | Completed final sign-off May 2017 | 124 Lakeview Av | 1/f- excavate +/-1' of earth and construct new walls for new 3 bedrooms, 2 bathrooms & a family. 2/f- relocate/remodel (e) kitchen and bedrooms, new bathrooms & new interior stair. 1 level wood deck at rear.Details
1/f- excavate +/-1' of earth and construct new walls for new 3 bedrooms, 2 bathrooms & a family. 2/f- relocate/remodel (e) kitchen and bedrooms, new bathrooms & new interior stair. 1 level wood deck at rear. | $49,000 |
| Dec 7, 2015 | Completed final sign-off Jun 2016 | 71 Sala Tr | add 1 bedroom, 1 family room, 1 full bath and laundry on existing gr fl and add 1 full bath on 2nd fl per planDetails
add 1 bedroom, 1 family room, 1 full bath and laundry on existing gr fl and add 1 full bath on 2nd fl per plan | $65,000 |
| Aug 28, 2014 | Completed final sign-off Dec 2014 | 778 25th Av | remodel kitchen, restroom, insulation, sheetrock, upgrade electrical, 10 new window not facing or visible from street. u factor windows, max 0.32. one full bathroom & one half bathroom.Details
remodel kitchen, restroom, insulation, sheetrock, upgrade electrical, 10 new window not facing or visible from street. u factor windows, max 0.32. one full bathroom & one half bathroom. | $35,000 |
| Dec 5, 2012 | Completed final sign-off Jul 2013 | 33 Alvarado St | unit#3: kitchen & bathroom remodel. replace kitchen cabinets, move electrical outlets & new floor. bathroom-convert tub to shower, new floor & new vanity.Details
unit#3: kitchen & bathroom remodel. replace kitchen cabinets, move electrical outlets & new floor. bathroom-convert tub to shower, new floor & new vanity. | $30,000 |
| Dec 13, 2010 | Completed final sign-off Apr 2011 | 4104 Geary Bl | fix and replace 16 windows, total 16 number at unit #4104, remodel (e) kitchen, counter top and cabinet, and bathroom sink, toilet to new and tileDetails
fix and replace 16 windows, total 16 number at unit #4104, remodel (e) kitchen, counter top and cabinet, and bathroom sink, toilet to new and tile | $2,500 |
| Jul 22, 2008 | Completed final sign-off Sep 2008 | 4631 Anza St | remodel existing bathroom install outlets to bathroom and kitchen outlets onlyDetails
remodel existing bathroom install outlets to bathroom and kitchen outlets only | $5,000 |
| Feb 2, 2006 | Completed final sign-off Mar 2006 | 2141 Taylor St | ((e) bathroom remodeling. replace all plumbing fixture & new lighting fixtures. (no structure) work in unit 2145 only.Details
((e) bathroom remodeling. replace all plumbing fixture & new lighting fixtures. (no structure) work in unit 2145 only. | $3,000 |