Calva Construction
- Based in
- San Jose
- On San Francisco permits
- Aug 2023 to Jan 2026
- Last 24 months
- 2 permits filed
8 permits since 2000: 4 completed, 3 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 51 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 15, 2024 | Completed final sign-off May 2025 | 1727 Lombard St | install new mixing valves on 53 bathrooms, install 1 or 2 lights in 53 bathrooms, install new laminated floos and baseboards, replace outlets and switches.Details
install new mixing valves on 53 bathrooms, install 1 or 2 lights in 53 bathrooms, install new laminated floos and baseboards, replace outlets and switches. | $120,000 |
| Jan 10, 2024 | Completed final sign-off Feb 2024 | 1501 Lombard St | install new mixing valve in 15 bathrooms on the 2nd floor. install new lights in 15 bathrooms on the 2nd floor. paint and install new laminated floor in 15 rooms on the 2nd floor. replace sink and receptacles in bathrooms.Details
install new mixing valve in 15 bathrooms on the 2nd floor. install new lights in 15 bathrooms on the 2nd floor. paint and install new laminated floor in 15 rooms on the 2nd floor. replace sink and receptacles in bathrooms. | $30,000 |
| Nov 21, 2023 | Completed final sign-off Jan 2024 | 1501 Lombard St | replace new switches & receptacles on the 3 floors in 15 rooms. install new mixing valves for showers on the 3rd floor in 15 rooms and install one light in each bathroom in 15 rooms on the third floor. paint 15 bath(s) & 15 rooms & install laminate flooring in bath/rooms (all locted on the 3rd flr)Details
replace new switches & receptacles on the 3 floors in 15 rooms. install new mixing valves for showers on the 3rd floor in 15 rooms and install one light in each bathroom in 15 rooms on the third floor. paint 15 bath(s) & 15 rooms & install laminate flooring in bath/rooms (all locted on the 3rd flr) | $18,000 |