Permit GraphShortlistSan Francisco building permits since 2000

California Thermal Window

Contractor license
459206
State license record
Based in
San Francisco
On San Francisco permits
Apr 2000 to Jan 2026
Last 24 months
4 permits filed

74 permits since 2000: 47 completed, 7 in progress, 10 never finaled, 10 expired or cancelled.

Of the 10 never-finaled permits, 1 is 3 to 5 years old, 7 are 5 to 10 years old, 2 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllDeck 1Stairs 1Kitchen remodel 5Bathroom remodel 2

2 bathroom remodel permits: 1 completed, 1 expired or cancelled. Typically 33 days from filing to permit and 58 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Mar 17, 2023Expired or cancelled
cancelled Jan 2026
583 10th Avinstall windows: (4) upfront master bedroom (facing street), (3) bathroom facing side street, (1) back side upstairs
Details
Permit
202303173936
Status
cancelled
Filed
Mar 17, 2023
Declared cost
$16,890
Address
583 10th Av

install windows: (4) upfront master bedroom (facing street), (3) bathroom facing side street, (1) back side upstairs

Open the permit page

$16,890
Mar 17, 2023Completed
final sign-off Jun 2023
2210 34th Avinstall in kind fron windows with marvin wood clap windows 6 windows 2 kitchen windows, 1 dining room, 1 patio window, 2 bathroom all not visible from the street. 6 total windows: same size, same location, max u-factor 0.30.
Details
Permit
202303173912
Status
complete
Filed
Mar 17, 2023
Permit issued
Apr 19, 2023
Final sign-off
Jun 16, 2023
Declared cost
$15,800
Address
2210 34th Av

install in kind fron windows with marvin wood clap windows 6 windows 2 kitchen windows, 1 dining room, 1 patio window, 2 bathroom all not visible from the street. 6 total windows: same size, same location, max u-factor 0.30.

Open the permit page

$15,800