California Steam Clean Llc
- Based in
- Santa Rosa
- On San Francisco permits
- Nov 2022 to Feb 2023
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 15, 2023 | Completed final sign-off May 2023 | 1776 46th Av | replace one window in kitchen with same size 42"x48"Details
replace one window in kitchen with same size 42"x48" | $1,000 |
| Nov 9, 2022 | Completed final sign-off Apr 2023 | 1776 46th Av | permit to comply with nov #202294133 for fire damage repair & kitchen remodel: replace drywall finish with 5/8" type x gyp. bd 1100 sf, refinish flooring 350 sf, painting and insulation. no structural work, no stud,joist & shtg replacement.Details
permit to comply with nov #202294133 for fire damage repair & kitchen remodel: replace drywall finish with 5/8" type x gyp. bd 1100 sf, refinish flooring 350 sf, painting and insulation. no structural work, no stud,joist & shtg replacement. | $41,696 |