California Remodeling Service
- Based in
- Pleasanton
- On San Francisco permits
- Jan 2013 to Mar 2018
- Last 24 months
- 0 permits filed
8 permits since 2000: 3 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 1 completed, 2 never finaled. Typically 260 days from filing to permit and 332 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 23, 2018 | Completed final sign-off Mar 2019 | 1835 Franklin St | revision to pa #201709067103 to memorialize as built conditions, reconfigure bathroom & closet, replace existing walls in living room & bed room with non combustible material (metal framing)Details
revision to pa #201709067103 to memorialize as built conditions, reconfigure bathroom & closet, replace existing walls in living room & bed room with non combustible material (metal framing) | $5,000 |
| Jun 12, 2017 | Never finaled issued Apr 2018, no final | 1386 Revere Av | revision to pa 2015-1223-5806 updated kitchen, bathrooms, bedroom, closet layouts.Details
revision to pa 2015-1223-5806 updated kitchen, bathrooms, bedroom, closet layouts. | |
| Dec 23, 2015 | Never finaled issued Sep 2016, no final | 1386 Revere Av | remodel 2nd floor with no change in bedroom count. add 2 new bedrooms, 1 new bath& 1 new kitchen on g/f. 2nd floor: remodel (e) bathroom and kitchen & add new bathroom. replace windows & add new rear egress stair.add rear deck, all new electric/plumbingDetails
remodel 2nd floor with no change in bedroom count. add 2 new bedrooms, 1 new bath& 1 new kitchen on g/f. 2nd floor: remodel (e) bathroom and kitchen & add new bathroom. replace windows & add new rear egress stair.add rear deck, all new electric/plumbing | $40,000 |