California Builders Const/Lst Holdings
- Based in
- San Leandro
- On San Francisco permits
- May 2000 to Oct 2008
- Last 24 months
- 0 permits filed
4 permits since 2000: 2 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 0 days from filing to permit and 112 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 11, 2007 | Completed final sign-off Jan 2008 | 720 Lombard St | 2nd & 3rd floors-dry rot repair on decks. 2nd fl: remove deck and replace with new slope roof; 3rd fl: repair (e) deck and replace railing w/metal cable railing; ground fl: install access door at rearDetails
2nd & 3rd floors-dry rot repair on decks. 2nd fl: remove deck and replace with new slope roof; 3rd fl: repair (e) deck and replace railing w/metal cable railing; ground fl: install access door at rear | $80,000 |