Back to bathroom remodel contractors
Caleb Hensel
- Based in
- Rutherford
- On San Francisco permits
- Apr 2009 to Mar 2017
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 78 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 8, 2017 | Completed final sign-off Mar 2017 | 2374 Pacific Av | work to be done in guest room bathroom. cap shower supply lines, cap off shower drain. close up floor and walls / sheet rock. install new linoleum and baseboard.Details
work to be done in guest room bathroom. cap shower supply lines, cap off shower drain. close up floor and walls / sheet rock. install new linoleum and baseboard. | $2,200 |
| May 6, 2011 | Completed final sign-off Oct 2011 | 2374 Pacific Av | remodel upper unit master bath and master bedroom. remove one non structural wall.fill in 2 windows, replace 2 extg windows, one new opening for window. replace double door with single door. window and door remodel not facing street.Details
remodel upper unit master bath and master bedroom. remove one non structural wall.fill in 2 windows, replace 2 extg windows, one new opening for window. replace double door with single door. window and door remodel not facing street. | $30,000 |
| Apr 27, 2009 | Completed final sign-off Jul 2009 | 2374 Pacific Av | bathroom remodel:2 replacemetn windows, no structural changes.not visable from the street. floor and wall tile. trim work new vanity cabinet, fixtures and paintDetails
bathroom remodel:2 replacemetn windows, no structural changes.not visable from the street. floor and wall tile. trim work new vanity cabinet, fixtures and paint | $14,000 |