Back to bathroom remodel contractors
Cal-Star Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2006 to Aug 2011
- Last 24 months
- 0 permits filed
8 permits since 2000: 6 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 0 days from filing to permit and 133 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 2, 2011 | Completed final sign-off Sep 2011 | 2589 Folsom St | remodeling existing bathroom 2nd floor. remove existing bath tub and install new shower. install sheetrock located electric and plumbing, and new tile. no structural work.Details
remodeling existing bathroom 2nd floor. remove existing bath tub and install new shower. install sheetrock located electric and plumbing, and new tile. no structural work. | $8,000 |
| Feb 16, 2007 | Completed final sign-off Oct 2007 | 219 Saint Charles Av | lower basement floor-remodeling basement, concrete slope, framing, bathroom and electrical include structural alteration to (e) foundation, floor framing.Details
lower basement floor-remodeling basement, concrete slope, framing, bathroom and electrical include structural alteration to (e) foundation, floor framing. | $130,000 |