Back to bathroom remodel contractors
Cal - Bay Craftsmen Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2001 to Jun 2016
- Last 24 months
- 0 permits filed
124 permits since 2000: 75 completed, 14 never finaled, 35 expired or cancelled.
Of the 14 never-finaled permits, 14 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 13 completed, 4 expired or cancelled. Typically 0 days from filing to permit and 279 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 23, 2015 | Completed final sign-off Mar 2016 | 441 Jersey St | remodel kitchen and 1 bathroom in-kindDetails
remodel kitchen and 1 bathroom in-kind | $20,000 |
| Mar 12, 2015 | Completed final sign-off Jun 2015 | 378 Sweeny St | remodel 1st fl to add a bedroom, 2 closets and a hall. legalize e full bath, relocate, washer dryer. at 2nd fl remodel (e) kitchen, remove wall between kitchen & (e) bedroom to create family room, convert e living room to a bedroom. remodel e 2nd fl bath. relace windows @ rear and e. updateDetails
remodel 1st fl to add a bedroom, 2 closets and a hall. legalize e full bath, relocate, washer dryer. at 2nd fl remodel (e) kitchen, remove wall between kitchen & (e) bedroom to create family room, convert e living room to a bedroom. remodel e 2nd fl bath. relace windows @ rear and e. update | $25,000 |
| Jan 21, 2015 | Completed final sign-off Feb 2016 | 248 San Carlos St | 3rd floor: remodel 2 bathrooms. 1st bath is extg 1/2 bath to be remodeled to a full bath. 2nd bath in just water closet to be remodeled to a half bath (sink and toilet)Details
3rd floor: remodel 2 bathrooms. 1st bath is extg 1/2 bath to be remodeled to a full bath. 2nd bath in just water closet to be remodeled to a half bath (sink and toilet) | $8,000 |
| Dec 19, 2014 | Completed final sign-off Dec 2015 | 27 Gaviota Wy | 1st fl relocate interior stair and alaundry. renovate full bath. install 2 ext doors, new deck and stair at rear. 2nd fl remove interior courtyard, infill roof and install 3 skylights, new kitchen and 1 full bath, renovate existing bath. replace 2 windows at rearDetails
1st fl relocate interior stair and alaundry. renovate full bath. install 2 ext doors, new deck and stair at rear. 2nd fl remove interior courtyard, infill roof and install 3 skylights, new kitchen and 1 full bath, renovate existing bath. replace 2 windows at rear | $175,000 |
| Sep 4, 2013 | Completed final sign-off Nov 2016 | 1330 Waller St | renovation & remodel of (e) garage into 2 car garage , storage & tv/family room & new bath, includes renovation of wash/dry area. infill ground floor lightwells (2 total).Details
renovation & remodel of (e) garage into 2 car garage , storage & tv/family room & new bath, includes renovation of wash/dry area. infill ground floor lightwells (2 total). | $130,000 |
| Mar 15, 2012 | Expired or cancelled expired May 2015 | 1887 34th Av | remove one bathroom down to studs. new lav, shower, toilet, upgrade electrical and plumbing.Details
remove one bathroom down to studs. new lav, shower, toilet, upgrade electrical and plumbing. | $20,000 |
| Sep 16, 2011 | Expired or cancelled cancelled Jan 2026 | 257 Collingwood St | convert (e) basement space into conditioned living space (412 sq ft) including 1 full bathroomDetails
convert (e) basement space into conditioned living space (412 sq ft) including 1 full bathroom | $20,000 |
| Sep 15, 2011 | Completed final sign-off Aug 2012 | 93 Carmel St | renovate & remodel (e) residence, expand garage & laundry room in lower level. 27 sf addition to main level & remodeled kitchen & bath, renovate (e) bedrooms, remodel (e) master bath & add one new bathroom on top floor.Details
renovate & remodel (e) residence, expand garage & laundry room in lower level. 27 sf addition to main level & remodeled kitchen & bath, renovate (e) bedrooms, remodel (e) master bath & add one new bathroom on top floor. | $380,000 |
| Aug 10, 2011 | Completed final sign-off May 2012 | 1750 Taylor St | 13th floor floor #1303 - remodel of existing condo including remodel bathrooms, replace (e) glazing, new electrical, plumbing, mech, cabinets & finishes.Details
13th floor floor #1303 - remodel of existing condo including remodel bathrooms, replace (e) glazing, new electrical, plumbing, mech, cabinets & finishes. | $300,000 |
| Oct 18, 2010 | Completed final sign-off Mar 2012 | 1188 Lombard St | minor renovation of (e) residence. new windows, 2 new rooftop terraces, remodeled mater bath, new kitchen appliances, new kit counter top and splash, interior painting, lighting in master bath bedroom.Details
minor renovation of (e) residence. new windows, 2 new rooftop terraces, remodeled mater bath, new kitchen appliances, new kit counter top and splash, interior painting, lighting in master bath bedroom. | $90,000 |
| Aug 3, 2010 | Completed final sign-off Nov 2010 | 1821 15th St | bathroom remodel, replace everything kin kind, new vanity, toilet, change tub to shower stall, tile floor, 5x8. kitchen remodel - replace in kind, new cabinets, sink, countertops, appliances 8x8.Details
bathroom remodel, replace everything kin kind, new vanity, toilet, change tub to shower stall, tile floor, 5x8. kitchen remodel - replace in kind, new cabinets, sink, countertops, appliances 8x8. | $40,000 |
| Jun 4, 2007 | Completed final sign-off Jul 2007 | 3957 19th St | replace existing master bathroom tub, toilet, sink and tile (tub surround). replace existing toilet and sink in powder room. no structural changes.Details
replace existing master bathroom tub, toilet, sink and tile (tub surround). replace existing toilet and sink in powder room. no structural changes. | $15,000 |
| Jun 1, 2006 | Expired or cancelled expired Apr 2008 | 236 Mullen Av | remodel existing bathroom & laundry room in existing location. no work on ground floorDetails
remodel existing bathroom & laundry room in existing location. no work on ground floor | $18,000 |
| Mar 20, 2006 | Expired or cancelled expired Mar 2009 | 652 Oak St | replace (e) foundation, add new bathrooms & windows. build new interior stair at rear of building.Details
replace (e) foundation, add new bathrooms & windows. build new interior stair at rear of building. | $150,000 |
| Jun 9, 2005 | Completed final sign-off Feb 2006 | 1570 Grove St | remodel bathroom - fix dry rot, re-sheetrock, move fixtures around new tile, work on 2nd level unitsDetails
remodel bathroom - fix dry rot, re-sheetrock, move fixtures around new tile, work on 2nd level units | $20,000 |
| Jun 8, 2005 | Completed final sign-off Dec 2005 | 1572 Grove St | remodel (e) kitchen & bathroom. add new half bath, upgrade elect, plumbing and mechanical system.Details
remodel (e) kitchen & bathroom. add new half bath, upgrade elect, plumbing and mechanical system. | $90,000 |
| Oct 8, 2002 | Completed final sign-off Aug 2003 | 748 Diamond St | move kitchen/bath in both unitDetails
move kitchen/bath in both unit | $60,000 |