Cal-Bay Builders Inc
- Based in
- Pleasanton
- On San Francisco permits
- Aug 2011 to Nov 2012
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 0 days from filing to permit and 232 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 18, 2012 | Completed final sign-off Jun 2013 | 1405 Douglass St | repair water damage drywall. replace tile and deck membrane at rear on 2nd floor deck. repair leaks at roof screen wall. interior repairs below 2nd floor deck and roof leaks. install epoxy coating on garage slab.Details
repair water damage drywall. replace tile and deck membrane at rear on 2nd floor deck. repair leaks at roof screen wall. interior repairs below 2nd floor deck and roof leaks. install epoxy coating on garage slab. | $163,635 |