Cai Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2021 to May 2026
- Last 24 months
- 5 permits filed
15 permits since 2000: 12 completed, 2 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 11, 2026 | In progress issued May 2026 | 816 25th Av | remodel 2 kitchens and 2 bath in kind on 1/f & 2/f.Details
remodel 2 kitchens and 2 bath in kind on 1/f & 2/f. | $70,000 |
| May 4, 2026 | In progress issued May 2026 | 1020 Plymouth Av | revision to 201701056576 (recommencement under 202509024411). 1/f: remove nonload bearing wall. 2/f: reconfigure interior layout with one living room, one dining room, one kitchen, one master bedroom. remove and relocate non load bearing wall. add a laundry and a storage room. add a barn door.Details
revision to 201701056576 (recommencement under 202509024411). 1/f: remove nonload bearing wall. 2/f: reconfigure interior layout with one living room, one dining room, one kitchen, one master bedroom. remove and relocate non load bearing wall. add a laundry and a storage room. add a barn door. | $30,000 |
| Sep 29, 2025 | Completed final sign-off Mar 2026 | 200 Alpha St | remodel full bathroom at 2nd floor. no removal of wallsDetails
remodel full bathroom at 2nd floor. no removal of walls | $15,000 |
| Aug 26, 2025 | Completed final sign-off Oct 2025 | 479 Pacheco St | remodel kitchen to replace countertops with new. (e) kitchen cabinets and appliances will stay.Details
remodel kitchen to replace countertops with new. (e) kitchen cabinets and appliances will stay. | $10,000 |
| Jun 9, 2025 | Completed final sign-off Oct 2025 | 479 Pacheco St | remodel one full bathroom in kind with shower in kind.Details
remodel one full bathroom in kind with shower in kind. | $20,000 |
| Jun 11, 2024 | Completed final sign-off Apr 2025 | 220 Raymond Av | 1/f: new bedroom, office, media room, bar and 2 bathrooms. relocate mechanical. 2/f: remodel 1 kitchen and 2 bathrooms. add 1 new bathroom.Details
1/f: new bedroom, office, media room, bar and 2 bathrooms. relocate mechanical. 2/f: remodel 1 kitchen and 2 bathrooms. add 1 new bathroom. | $200,000 |
| Jun 11, 2024 | Completed final sign-off Jun 2025 | 518 Brussels St | 1/f: (n) bedroom, media, office, gym, bathroom & 1/2 bathroom with bar. relocate mech room. 2/f: remodel kitchen and baths, new bathroom.Details
1/f: (n) bedroom, media, office, gym, bathroom & 1/2 bathroom with bar. relocate mech room. 2/f: remodel kitchen and baths, new bathroom. | $200,000 |
| Jul 25, 2023 | Completed final sign-off May 2026 | 136 Ellington Av | 1st flr: interior remodel: add 2 bedrooms, 1 full bathroom, excercise room, and wetbar.Details
1st flr: interior remodel: add 2 bedrooms, 1 full bathroom, excercise room, and wetbar. | $120,000 |
| Apr 25, 2023 | Completed final sign-off Jul 2023 | 2022 29th Av | 2nd floor (1) bathroom remodel, change shower pan, tiles, toilet, cabinet, add 2 electrical outlet, add exhaust fan. non-structural.Details
2nd floor (1) bathroom remodel, change shower pan, tiles, toilet, cabinet, add 2 electrical outlet, add exhaust fan. non-structural. | $10,000 |
| Mar 23, 2023 | Completed final sign-off Oct 2023 | 177 Meadowbrook Dr | 1st fl: relocate laundry. 2nd fl: remodel bathroom & add laundryDetails
1st fl: relocate laundry. 2nd fl: remodel bathroom & add laundry | $15,000 |
| Mar 14, 2022 | Completed final sign-off Oct 2022 | 2022 Bancroft Av | replace 6 windows. 2 facing the road. 4 in back, all vinyl. 2 in front aluminum sliders. replace in existing openings. u less than 0.30.Details
replace 6 windows. 2 facing the road. 4 in back, all vinyl. 2 in front aluminum sliders. replace in existing openings. u less than 0.30. | $5,000 |
| Mar 7, 2022 | Never finaled issued Mar 2022, no final | 30 Auburn St | replace 9 windows, five (5) visible from street (single-hung, wood framed).Details
replace 9 windows, five (5) visible from street (single-hung, wood framed). | $2,000 |
| Dec 2, 2021 | Completed final sign-off Mar 2022 | 30 Auburn St | remodel kitchen, bathroom on 1st floor. no removal of wallsDetails
remodel kitchen, bathroom on 1st floor. no removal of walls | $30,000 |
| Oct 26, 2021 | Completed final sign-off Dec 2021 | 2050 Alemany Bl | install water heater tankless. install flue to roof. install gas line to water heater location and heat location. install 2 electrical outlets. cover up heat vent and gas pipes with dry wall.Details
install water heater tankless. install flue to roof. install gas line to water heater location and heat location. install 2 electrical outlets. cover up heat vent and gas pipes with dry wall. | $6,000 |
| Jul 12, 2021 | Completed final sign-off Oct 2021 | 2067 Carroll Av | remodel kitchen. replace tile, countertiop, sink. add electrical outlets. non-structural. no layout change.Details
remodel kitchen. replace tile, countertiop, sink. add electrical outlets. non-structural. no layout change. | $20,000 |