Back to bathroom remodel contractors
Ca Sunrise Construction Solution Inc
- Based in
- San Mateo
- On San Francisco permits
- Jan 2015 to Aug 2026
- Last 24 months
- 6 permits filed
29 permits since 2000: 17 completed, 4 in progress, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 1 is 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 never finaled. Typically 20 days from filing to permit and 160 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 14, 2018 | Completed final sign-off Dec 2018 | 37 Maddux Av | remodel kitchen with new cabinets & appliances. install new vanity cabinet in bathroom.Details
remodel kitchen with new cabinets & appliances. install new vanity cabinet in bathroom. | $5,000 |
| Aug 24, 2016 | Completed final sign-off Jan 2017 | 3470 17th St | bathroom remodel, shower installation, tile works, new vanity and new lightsDetails
bathroom remodel, shower installation, tile works, new vanity and new lights | $5,000 |
| Aug 2, 2016 | Completed final sign-off Sep 2016 | 2042 Grove St | bath remodel. (e) plumbing/electrical to remain. new fixtures, new tile. layout and walls to remain "as-is"Details
bath remodel. (e) plumbing/electrical to remain. new fixtures, new tile. layout and walls to remain "as-is" | $8,000 |
| Sep 11, 2015 | Completed final sign-off Oct 2017 | 531 Arguello Bl | single story horizontal addition to (e) 3 story bldg. includes plumbing, structural, electrical and roof deck. 1 bath addition in new addition 3/fDetails
single story horizontal addition to (e) 3 story bldg. includes plumbing, structural, electrical and roof deck. 1 bath addition in new addition 3/f | $150,000 |
| Jul 16, 2015 | Never finaled issued Aug 2015, no final | 143 Lower Tr | remodel 2 levels of (e) residence, remodel kitchen and bathrooms, create (n) 370 sq.ft. master suite in attic, new stair. no work visable from street, no sprinkler or fire alarm.Details
remodel 2 levels of (e) residence, remodel kitchen and bathrooms, create (n) 370 sq.ft. master suite in attic, new stair. no work visable from street, no sprinkler or fire alarm. | $95,000 |
| Jan 22, 2015 | Completed final sign-off Oct 2016 | 1140 Sutter St | interior remodel in apt 510: non structural alteration. relocate kitchen. remodel extg bathroom. provide new bedroom. no egress window req'd 5th floor above grade.Details
interior remodel in apt 510: non structural alteration. relocate kitchen. remodel extg bathroom. provide new bedroom. no egress window req'd 5th floor above grade. | $25,000 |