Back to bathroom remodel contractors
Ca Bear Construction
- Based in
- Oakland
- On San Francisco permits
- Feb 2018 to Jun 2026
- Last 24 months
- 1 permit filed
9 permits since 2000: 6 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 1 completed, 1 in progress, 1 never finaled. Typically 12 days from filing to permit and 309 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 3, 2026 | In progress issued Jul 2026 | 1074 Treat Av | addition of (n) bathroom. relocation of (e) bathroom. extension and remodel of 2 (e) bedrooms.Details
addition of (n) bathroom. relocation of (e) bathroom. extension and remodel of 2 (e) bedrooms. | $200,000 |
| Jul 25, 2019 | Completed final sign-off Jun 2020 | 832 Folsom St | reuse existing a/c units & provide new duct distribution. provide new exhaust for bathroom & janitor closet. reuse existing electrical panel. provide new circuiting and new light fixtures. ref bpa #201907035071.Details
reuse existing a/c units & provide new duct distribution. provide new exhaust for bathroom & janitor closet. reuse existing electrical panel. provide new circuiting and new light fixtures. ref bpa #201907035071. | $25,000 |
| Feb 21, 2018 | Never finaled issued Feb 2018, no final | 345 Ney St | replace/install new fixture in bath. repair water damage wood members along side of property approx. 100 sq. ft. area. upgrade panel from 100 to 125 amps.Details
replace/install new fixture in bath. repair water damage wood members along side of property approx. 100 sq. ft. area. upgrade panel from 100 to 125 amps. | $2,000 |