C V K Construction
- Based in
- Berkeley
- On San Francisco permits
- Mar 2014 to Aug 2018
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 expired or cancelled. Typically 704 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 21, 2014 | Expired or cancelled expired Mar 2025 | 134 Athens St | rebuild home destroyed by fire on remaining foundation. (see drawings for details of scope) with vertical extension. add 1 bedroom & 1 bath. home to have 4 bedrooms, 3 baths.Details
rebuild home destroyed by fire on remaining foundation. (see drawings for details of scope) with vertical extension. add 1 bedroom & 1 bath. home to have 4 bedrooms, 3 baths. | $375,000 |