C M B Construction
- Based in
- Oakley
- On San Francisco permits
- Mar 2004 to Jun 2009
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 9, 2009 | Completed final sign-off Apr 2010 | 2034 Beach St | legalize full bath at lower level, remove (e) posts at (e) game rm, add steel frame and beam to replace posts, add steel frame at garage. adjust current electric plan. remove (e) gas fire place. move one sink to (n) location.Details
legalize full bath at lower level, remove (e) posts at (e) game rm, add steel frame and beam to replace posts, add steel frame at garage. adjust current electric plan. remove (e) gas fire place. move one sink to (n) location. | $55,000 |
| Mar 11, 2004 | Completed final sign-off Jul 2004 | 135 25th Av | replace (e)door overhang to match house,same size,same locationDetails
replace (e)door overhang to match house,same size,same location | $5,000 |