Back to bathroom remodel contractors
C L & Y Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2008 to Aug 2026
- Last 24 months
- 5 permits filed
83 permits since 2000: 72 completed, 4 in progress, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
30 bathroom remodel permits: 26 completed, 1 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 73 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 28, 2024 | Completed final sign-off Nov 2024 | 1400 Ortega St | revision pa #202303143683, no change to structural plans. relocate bathroom on 1/f, remove propsoed wine cellar & media room. enlarge 2/f kitchen counter per plan. relocate bathroom fixtures & door openings for bathroom, closet, & bedroom on 3/f.Details
revision pa #202303143683, no change to structural plans. relocate bathroom on 1/f, remove propsoed wine cellar & media room. enlarge 2/f kitchen counter per plan. relocate bathroom fixtures & door openings for bathroom, closet, & bedroom on 3/f. | |
| Mar 14, 2023 | Completed final sign-off Nov 2024 | 1400 Ortega St | window replacmeent. foundation repair at ground floor. convert (e) storage into habitable space at g/f. add new ent area, media room, wine cellar & bath at g/f. add 2 new mech rooms; remodel (e) kitchen @2/f for both units. reconfigure int.staircase for both units. add (n) roof deck at 3/f for 1400.Details
window replacmeent. foundation repair at ground floor. convert (e) storage into habitable space at g/f. add new ent area, media room, wine cellar & bath at g/f. add 2 new mech rooms; remodel (e) kitchen @2/f for both units. reconfigure int.staircase for both units. add (n) roof deck at 3/f for 1400. | $200,000 |
| Aug 1, 2022 | Completed final sign-off Aug 2022 | 2071 Fulton St | replace dryrottd 2 to 4 studs in bathroom remodel. only in the bathroom. revision to 202207289437 to comply with #2021179391 only in bathroom. unit 1Details
replace dryrottd 2 to 4 studs in bathroom remodel. only in the bathroom. revision to 202207289437 to comply with #2021179391 only in bathroom. unit 1 | |
| Jul 28, 2022 | Completed final sign-off Aug 2022 | 2071 Fulton St | unit #1. one bathroom remodel. non-structural. repair bathroom drywall ceiling, re-tile bathtub/shower tiles.Details
unit #1. one bathroom remodel. non-structural. repair bathroom drywall ceiling, re-tile bathtub/shower tiles. | $5,000 |
| Aug 20, 2021 | Completed final sign-off Oct 2021 | 1215 Bay St | unit 9: remodeling one bathroom: bathtub, faucet, new tiles (floor and wall) non structural. lights per cec 150.0 (k)Details
unit 9: remodeling one bathroom: bathtub, faucet, new tiles (floor and wall) non structural. lights per cec 150.0 (k) | $7,000 |
| Aug 2, 2021 | Completed final sign-off Oct 2021 | 1215 Bay St | apt 6: remodel one kitchen & one bathroom. all work in-kind. layout unchanged. no walls mod or infilled. lights per cenc 150.0(k)Details
apt 6: remodel one kitchen & one bathroom. all work in-kind. layout unchanged. no walls mod or infilled. lights per cenc 150.0(k) | $20,000 |
| Dec 22, 2020 | Completed final sign-off Feb 2021 | 1215 Bay St | unit #5: remodeling kitchen: new cabinet, kitchen sink, faucet, dishwasher. remodeling bathroom: bathtub, faucet, toilet, bathroom, sink & faucet,Details
unit #5: remodeling kitchen: new cabinet, kitchen sink, faucet, dishwasher. remodeling bathroom: bathtub, faucet, toilet, bathroom, sink & faucet, | $20,000 |
| Nov 9, 2020 | Completed final sign-off Feb 2021 | 1215 Bay St | #10: remodel kitchen, new cabinet, kitchen sink, faucet, dishwasher. remodel bathroom, with bathtub, faucet, toilet, bathroom sink, faucet.Details
#10: remodel kitchen, new cabinet, kitchen sink, faucet, dishwasher. remodel bathroom, with bathtub, faucet, toilet, bathroom sink, faucet. | $30,000 |
| Aug 28, 2019 | Expired or cancelled expired Feb 2025 | 2270 Francisco St | addition of new unit on 1st fl under ordinance #162-16. unit #70a: 565 sq ft studio with one kitchen,one bath and one study nook/office.Details
addition of new unit on 1st fl under ordinance #162-16. unit #70a: 565 sq ft studio with one kitchen,one bath and one study nook/office. | $20,000 |
| Jan 8, 2018 | Completed final sign-off Dec 2018 | 109 Clement St | apt #1,2,3,5 - remove & replace tiles @ bathrooms & remove kitchen cabinets & replace with new sinks & cabinets, countertops.Details
apt #1,2,3,5 - remove & replace tiles @ bathrooms & remove kitchen cabinets & replace with new sinks & cabinets, countertops. | $15,000 |
| Aug 21, 2017 | Completed final sign-off Aug 2018 | 40 Thrift St | remodel 2 baths: bath #1: install (n) light fixture in (e) location . install (n) toilet in (e) location, install (n) sink & faucets in (e) location, install (n) shower in (e) location. bath #2: install (n) light fixtures & (n) sink & faucet in (e) location. no alter wall, window & door.Details
remodel 2 baths: bath #1: install (n) light fixture in (e) location . install (n) toilet in (e) location, install (n) sink & faucets in (e) location, install (n) shower in (e) location. bath #2: install (n) light fixtures & (n) sink & faucet in (e) location. no alter wall, window & door. | $2,000 |
| Dec 29, 2016 | Completed final sign-off Mar 2017 | 2327 Turk Bl | remodel existing bathroom on floor 2 unit into 2 new baths. new fixtures, finishes, lighting in new floor 2 baths. replace skylightDetails
remodel existing bathroom on floor 2 unit into 2 new baths. new fixtures, finishes, lighting in new floor 2 baths. replace skylight | $18,000 |
| Aug 5, 2016 | Expired or cancelled expired Oct 2022 | 34 Jasper Pl | legalize (e) illegal unit per ordinance# 43-14. ground floor (1) kitchen, 1 bath, 1 studio.Details
legalize (e) illegal unit per ordinance# 43-14. ground floor (1) kitchen, 1 bath, 1 studio. | $10,000 |
| Aug 5, 2016 | Never finaled issued Feb 2017, no final | 340 Silliman St | legalize (e) unit per ordinance 43-14 ground floor, 1 bedroom, 1 bath, 1 kitchen.Details
legalize (e) unit per ordinance 43-14 ground floor, 1 bedroom, 1 bath, 1 kitchen. | $10,000 |
| Mar 22, 2016 | Completed final sign-off May 2016 | 1646 Sutter St | unit #403 - comply w/nov #201699932: replace kitchen cabinet, remove & replace tile @ bathroom.Details
unit #403 - comply w/nov #201699932: replace kitchen cabinet, remove & replace tile @ bathroom. | $8,000 |
| Apr 20, 2015 | Completed final sign-off Apr 2015 | 39 Spofford St | to comply with complaint#201537191. install knob bars @ water closet & bathrooms facilities per dao-1 only in 4 toilets & 4 showers.Details
to comply with complaint#201537191. install knob bars @ water closet & bathrooms facilities per dao-1 only in 4 toilets & 4 showers. | $1,000 |
| Jan 13, 2015 | Completed final sign-off Apr 2015 | 2482 45th Av | construct 2 new bathrooms, 1 office, family room and storage room on ground floor.Details
construct 2 new bathrooms, 1 office, family room and storage room on ground floor. | $38,000 |
| Apr 25, 2014 | Completed final sign-off May 2014 | 858 Washington St | comply with complaint #201463451, item #2 for provide grab bars in all common area, bathroom, toilet rooms, ordiance 029-13Details
comply with complaint #201463451, item #2 for provide grab bars in all common area, bathroom, toilet rooms, ordiance 029-13 | $1,500 |
| Apr 25, 2014 | Completed final sign-off May 2014 | 705 Broadway | comply with complaint #201467141, item #2 for provide grab bars in all common area, bathroom, toilet rooms, ordiance 029-13Details
comply with complaint #201467141, item #2 for provide grab bars in all common area, bathroom, toilet rooms, ordiance 029-13 | $500 |
| Mar 21, 2014 | Completed final sign-off Apr 2014 | 1405 Golden Gate Av | remodel kitchen, replace cabinet only & re-tile bathroom. electrical & plumbing permit by other, no changes to door or windows under this permit. to comply with cc# 7453Details
remodel kitchen, replace cabinet only & re-tile bathroom. electrical & plumbing permit by other, no changes to door or windows under this permit. to comply with cc# 7453 | $6,000 |
| Jul 8, 2013 | Completed final sign-off May 2014 | 91 Aptos Av | remodel e 2 baths and kitchen at 2nd fl. add 1/2 bath. ground floor convert e social room into 2 bedrooms. remove e bathrm and construct new family room and 1 new bathrm. all work at gr flDetails
remodel e 2 baths and kitchen at 2nd fl. add 1/2 bath. ground floor convert e social room into 2 bedrooms. remove e bathrm and construct new family room and 1 new bathrm. all work at gr fl | $65,000 |
| Mar 4, 2013 | Completed final sign-off Sep 2013 | 1404 Stockton St | remodeling unit # 1416 stockton street only (residential for bathroom and kitchen in kind. no structural work.Details
remodeling unit # 1416 stockton street only (residential for bathroom and kitchen in kind. no structural work. | $12,000 |
| Feb 4, 2013 | Completed final sign-off Jul 2013 | 129 Stratford Dr | construct one new bathroom & upgrade (e) family room at ground floor. construct new deck w/staircase at rear of bldg ( size aprox 17'-0" x 10"-0").Details
construct one new bathroom & upgrade (e) family room at ground floor. construct new deck w/staircase at rear of bldg ( size aprox 17'-0" x 10"-0"). | $23,000 |
| Feb 4, 2013 | Completed final sign-off Jul 2013 | 129 Stratford Dr | remodel (e) bathroom/kitchen at second floor, remodel (e) bathroom in kind at third floor & re-wire elect lighting. ref pa #2013.0204.9366.Details
remodel (e) bathroom/kitchen at second floor, remodel (e) bathroom in kind at third floor & re-wire elect lighting. ref pa #2013.0204.9366. | $35,000 |
| Jan 22, 2013 | Completed final sign-off May 2013 | 2435 38th Av | legalize 2 bed rooms, one bath room and construct one new bath. all work at ground floor.Details
legalize 2 bed rooms, one bath room and construct one new bath. all work at ground floor. | $32,000 |
| Nov 27, 2012 | Expired or cancelled expired May 2014 | 1720 Stockton St | replace kitchen cabinets only and repair damage tile at bathroom only. no electrical and plumbing workDetails
replace kitchen cabinets only and repair damage tile at bathroom only. no electrical and plumbing work | $3,000 |
| Dec 16, 2011 | Completed final sign-off Feb 2012 | 750 Pacific Av | tenant improvement of ground floor and no exterior work. mep under separate permit, remodel (e) bathroom.Details
tenant improvement of ground floor and no exterior work. mep under separate permit, remodel (e) bathroom. | $20,000 |
| Jul 25, 2011 | Completed final sign-off Oct 2011 | 266 22nd Av | construct one bedroom (in-fill under (e) sunroom), family room & one full bathroom. all work at ground floor.Details
construct one bedroom (in-fill under (e) sunroom), family room & one full bathroom. all work at ground floor. | $32,000 |
| Nov 17, 2010 | Completed final sign-off Jan 2011 | 285 Castenada Av | remodeling the bathrooms & kitchen per plan.Details
remodeling the bathrooms & kitchen per plan. | $10,000 |
| Aug 3, 2010 | Completed final sign-off Dec 2010 | 679 Edinburgh St | legalize (e) one bedroom, storage rooms and construct one new full bathroom at ground floorDetails
legalize (e) one bedroom, storage rooms and construct one new full bathroom at ground floor | $38,000 |