Back to bathroom remodel contractors
C L O Construction
- Based in
- Point Richmond
- On San Francisco permits
- Aug 2007 to Aug 2026
- Last 24 months
- 4 permits filed
54 permits since 2000: 42 completed, 2 in progress, 7 never finaled, 3 expired or cancelled.
Of the 7 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
21 bathroom remodel permits: 14 completed, 1 in progress, 3 never finaled, 3 expired or cancelled. Typically 4 days from filing to permit and 306 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 18, 2026 | In progress issued Jun 2026 | 568 05th Av | unit 3- replacing fixtures and finishes for 3x bathrooms and laundry room in kind. no wall removal or layout changes.Details
unit 3- replacing fixtures and finishes for 3x bathrooms and laundry room in kind. no wall removal or layout changes. | $30,000 |
| Feb 24, 2022 | Never finaled issued Jun 2022, no final | 315 Santa Clara Av | remodel basement and add full bath. no change to area.Details
remodel basement and add full bath. no change to area. | $85,000 |
| Oct 7, 2019 | Completed final sign-off Jul 2023 | 70 Deming St | replace all (12) exterior windows with new marvin ultrex wood units to match extg. replace all exterior doors (5) with new marvin ultrex wood units, replace decks and roofs railings. add 2 skylights, remodel 3 kitchens and 4 bathrooms and interior non bearing wall remodeling.Details
replace all (12) exterior windows with new marvin ultrex wood units to match extg. replace all exterior doors (5) with new marvin ultrex wood units, replace decks and roofs railings. add 2 skylights, remodel 3 kitchens and 4 bathrooms and interior non bearing wall remodeling. | $120,000 |
| Jul 2, 2018 | Completed final sign-off Oct 2021 | 1919 19th St | remodel (e) kitchen and (e) bath in-kindDetails
remodel (e) kitchen and (e) bath in-kind | $55,000 |
| Dec 5, 2016 | Completed final sign-off Dec 2018 | 361 Hazelwood Av | convert portion of extg garage into habitable space including family room, home office, 2 bedroom, half bathroom and full bath.Details
convert portion of extg garage into habitable space including family room, home office, 2 bedroom, half bathroom and full bath. | $150,000 |
| Dec 22, 2015 | Expired or cancelled expired Jun 2018 | 55 San Benito Wy | remodel kitchen, 1st half bath, 2nd floor master and guest bath, modify master closet, enlarge attic access. modify garage storage. add doorway to crawl space.Details
remodel kitchen, 1st half bath, 2nd floor master and guest bath, modify master closet, enlarge attic access. modify garage storage. add doorway to crawl space. | $98,500 |
| Oct 5, 2015 | Expired or cancelled expired Nov 2019 | 1 Massasoit St | revision to pa 2010 0820 9282-s1-r1: smaller skylights, enlarge bay east side, eliminate rear deck stairs, expand deck by 1 foot, new windows front facade, minor change to interior floor plan @ m.bath/closets & kitchenDetails
revision to pa 2010 0820 9282-s1-r1: smaller skylights, enlarge bay east side, eliminate rear deck stairs, expand deck by 1 foot, new windows front facade, minor change to interior floor plan @ m.bath/closets & kitchen | |
| Apr 24, 2015 | Completed final sign-off Mar 2016 | 1746 Great Hy | revision to pa# 2014 0514 5763: update structural info, reconfigure 2nd floor, reconfigure laundry room, adjust height of 2nd flr bathroomDetails
revision to pa# 2014 0514 5763: update structural info, reconfigure 2nd floor, reconfigure laundry room, adjust height of 2nd flr bathroom | |
| Apr 8, 2015 | Completed final sign-off Mar 2016 | 361 Hazelwood Av | remodel of (e) kitchen and bathroom. rebuild (e) stair and create laundry colset.Details
remodel of (e) kitchen and bathroom. rebuild (e) stair and create laundry colset. | $80,000 |
| Oct 22, 2014 | Never finaled issued Sep 2016, no final | 48 Yukon St | renovation, consiting of remodeled kitchen & baths, remodeled bedrooms & living areas. new windows & siding. adding a roof deck at (e) lower roof. horizontal new entry at front of house & legalization of ground floor rooms.Details
renovation, consiting of remodeled kitchen & baths, remodeled bedrooms & living areas. new windows & siding. adding a roof deck at (e) lower roof. horizontal new entry at front of house & legalization of ground floor rooms. | $200,000 |
| Jun 2, 2014 | Completed final sign-off Apr 2015 | 504 Belvedere St | interior remodel of extg master bath, half bath and laundry room. no structural or exterior work.Details
interior remodel of extg master bath, half bath and laundry room. no structural or exterior work. | $18,000 |
| May 14, 2014 | Completed final sign-off Mar 2016 | 1746 Great Hy | to clear violation#201344991. add a new bedroom, bathroom, garage & stair. replace (e) windows door +skylights. remodel (e) bathroom, kitchen and all interior spaces.Details
to clear violation#201344991. add a new bedroom, bathroom, garage & stair. replace (e) windows door +skylights. remodel (e) bathroom, kitchen and all interior spaces. | $275,000 |
| Jan 28, 2014 | Completed final sign-off Sep 2014 | 68 Blake St | update kitchen, add 1/2 bath and expand e bath into lightwell. add 2 skylights. legalize gr fl bath and studyDetails
update kitchen, add 1/2 bath and expand e bath into lightwell. add 2 skylights. legalize gr fl bath and study | $65,000 |
| Jun 5, 2013 | Completed final sign-off May 2014 | 100 Galewood Cr | kitchen & bathroom & wet bar remodel. cut back bearing wall & removing a non bearing wallDetails
kitchen & bathroom & wet bar remodel. cut back bearing wall & removing a non bearing wall | $65,000 |
| Jan 18, 2013 | Completed final sign-off Jan 2014 | 463 Ellsworth St | renovate extg kitchen and bath at 2nd level. reconstruct stair between 1st and 2nd level. renovate extg bath at 3rd level. replace windows at rear elevation. remove e rear deck construct new rear stair.Details
renovate extg kitchen and bath at 2nd level. reconstruct stair between 1st and 2nd level. renovate extg bath at 3rd level. replace windows at rear elevation. remove e rear deck construct new rear stair. | $80,000 |
| Jul 25, 2012 | Completed final sign-off Oct 2012 | 4061 25th St | remove interior finishes of existing 2/f boys bathroom, replace with new, replace tub, finish plumbing, tile, sink, toilet. add recessed lighting & heat mat.Details
remove interior finishes of existing 2/f boys bathroom, replace with new, replace tub, finish plumbing, tile, sink, toilet. add recessed lighting & heat mat. | $8,000 |
| Oct 21, 2011 | Completed final sign-off Dec 2011 | 245 Randall St | remodel existing bathroom & kitchen to include moving one gas line for stove & adding one sink, no structural work, new lighting, comply w/cec 150 (k).Details
remodel existing bathroom & kitchen to include moving one gas line for stove & adding one sink, no structural work, new lighting, comply w/cec 150 (k). | $25,000 |
| Sep 13, 2011 | Completed final sign-off Nov 2011 | 300 Beale St | remove & replace kitchen cabinets, countertops & appliances, remove & replace bathroom tub, fixtures & tile, vanity & toilet & sink, closet door (hallway).Details
remove & replace kitchen cabinets, countertops & appliances, remove & replace bathroom tub, fixtures & tile, vanity & toilet & sink, closet door (hallway). | $25,000 |
| Sep 9, 2011 | Never finaled issued Sep 2011, no final | 300 Beale St | remove & replace kitchen cabinets, countertop and appliances, remove and replace bathroom tub, fixtures & tile, vanity, toilet sink. new hall closet door.Details
remove & replace kitchen cabinets, countertop and appliances, remove and replace bathroom tub, fixtures & tile, vanity, toilet sink. new hall closet door. | $25,000 |
| Jan 8, 2010 | Expired or cancelled expired Mar 2018 | 2501 Jones St | infill lower level under pop-out @ rear yd. screening @ front covered entry. enlarge (e) roof deck w/2 new access doors. (n) 2-baths, remodel baths, 1-kitchen, 1-wet bar @ lower level. reconfigure lower level, (n) stairs. replace all windows w/ insul. clad windows.Details
infill lower level under pop-out @ rear yd. screening @ front covered entry. enlarge (e) roof deck w/2 new access doors. (n) 2-baths, remodel baths, 1-kitchen, 1-wet bar @ lower level. reconfigure lower level, (n) stairs. replace all windows w/ insul. clad windows. | $200,000 |
| Aug 30, 2007 | Completed final sign-off Nov 2007 | 718 Grand View Av | remodel (e) bathroom with new vanity, sink, toilet, medicine cabinet, tub and tiles. remodel (e) kitchen with new cabiets, appliances, countertop/sink and ceramic floor. replace five windows. replace garage door. no structural work.Details
remodel (e) bathroom with new vanity, sink, toilet, medicine cabinet, tub and tiles. remodel (e) kitchen with new cabiets, appliances, countertop/sink and ceramic floor. replace five windows. replace garage door. no structural work. | $45,000 |