Back to bathroom remodel contractors
C K & D W Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2010 to Apr 2014
- Last 24 months
- 0 permits filed
9 permits since 2000: 8 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 expired or cancelled. Typically 12 days from filing to permit and 317 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 28, 2014 | Completed final sign-off Apr 2015 | 3326 Wawona St | construct rear deck 9' ht at rear of (e) building. add 1 bedroom, 1 family room, 1 full bath, and laundry on ex ground floor. add 1 full bath. remodel existing bath, kitchen on 2nd floor.Details
construct rear deck 9' ht at rear of (e) building. add 1 bedroom, 1 family room, 1 full bath, and laundry on ex ground floor. add 1 full bath. remodel existing bath, kitchen on 2nd floor. | $70,000 |
| Aug 8, 2013 | Completed final sign-off Jul 2014 | 2107 31st Av | add family room, full bath downstairs. remodel kitchen and livng room upstairs. infill space under e 2nd fl popout portionDetails
add family room, full bath downstairs. remodel kitchen and livng room upstairs. infill space under e 2nd fl popout portion | $35,000 |
| Jul 2, 2013 | Completed final sign-off Jul 2014 | 154 Madrid St | interior remodel of single family dwelling. add 1 bedroom, 1 family room, and 1/2 bath at 1st fl. relocate bedroom, kitchen and dining room at 2nd fl. add 1 bath at 2nd fl, mech, elec, plumbing under separate permitDetails
interior remodel of single family dwelling. add 1 bedroom, 1 family room, and 1/2 bath at 1st fl. relocate bedroom, kitchen and dining room at 2nd fl. add 1 bath at 2nd fl, mech, elec, plumbing under separate permit | $50,000 |
| Jun 12, 2013 | Expired or cancelled expired Jul 2015 | 2426 41st Av | legalize (e) infill area under sunroom as a bedroom with full bath & add family room, storage, full baths @ garage floor. convert sunroom to bedroom with a new full bath @ 2nd floor.;Details
legalize (e) infill area under sunroom as a bedroom with full bath & add family room, storage, full baths @ garage floor. convert sunroom to bedroom with a new full bath @ 2nd floor.; | $70,000 |
| Sep 7, 2012 | Completed final sign-off Feb 2013 | 83 Bridgeview Dr | 1st floor alteration to add two bedrooms, an office, a full bathroom, add half bathroom on 2nd floor. relocated furnace and water heater.Details
1st floor alteration to add two bedrooms, an office, a full bathroom, add half bathroom on 2nd floor. relocated furnace and water heater. | $55,000 |
| Apr 19, 2010 | Completed final sign-off Jul 2010 | 175 Vernon St | to comply with 200797895. construct non-bearing walls for new full bathroom, 2 bedrooms, hallway and laundry room. relocate (e) water heater and furnace. upgrade (e) electrical panel to 100 amp panel.Details
to comply with 200797895. construct non-bearing walls for new full bathroom, 2 bedrooms, hallway and laundry room. relocate (e) water heater and furnace. upgrade (e) electrical panel to 100 amp panel. | $35,000 |