Back to bathroom remodel contractors
C K Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2015 to Jun 2026
- Last 24 months
- 6 permits filed
37 permits since 2000: 30 completed, 5 in progress, 2 never finaled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
21 bathroom remodel permits: 18 completed, 2 in progress, 1 never finaled. Typically 26 days from filing to permit and 214 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 20, 2026 | Completed final sign-off May 2026 | 1608 Balboa St | add 1 bathroom and laundry. replace 6 front windows in kind with vinyl.Details
add 1 bathroom and laundry. replace 6 front windows in kind with vinyl. | $15,000 |
| Aug 11, 2025 | Completed final sign-off May 2026 | 603 San Jose Av | bathroom remodel with 8 sf lightwell infillDetails
bathroom remodel with 8 sf lightwell infill | $20,000 |
| Sep 12, 2024 | Completed final sign-off Feb 2025 | 1641 Chestnut St | 2/f: bathroom remodel. 3/f: bathroom remodel. (2) shower pans. (all work in kind), no wall construction or demolition.Details
2/f: bathroom remodel. 3/f: bathroom remodel. (2) shower pans. (all work in kind), no wall construction or demolition. | $5,000 |
| Jun 21, 2024 | Completed final sign-off Feb 2025 | 1641 Chestnut St | remodel (e) kitchen, relocate (e) bathroom. add one bedroom, laundry room, & replace (e) sheetrock w/ new. all work at g/f.Details
remodel (e) kitchen, relocate (e) bathroom. add one bedroom, laundry room, & replace (e) sheetrock w/ new. all work at g/f. | $178,200 |
| Apr 11, 2023 | Completed final sign-off May 2024 | 2047 Broadway | interior renovation of (e) non-accessible, approx. 500sf studio apt including kitchen, bath remodel, new electrical/plumbing, new windows all within (e) bldg envelope. street facing exterior window modification.Details
interior renovation of (e) non-accessible, approx. 500sf studio apt including kitchen, bath remodel, new electrical/plumbing, new windows all within (e) bldg envelope. street facing exterior window modification. | $30,000 |
| Jan 26, 2023 | In progress issued Sep 2025 | 355 Capp St | unit legalization per ordinance 43-14, planning code section 207.3. legalize (e) dwelling unit 355a capp st. unit included bedrooms, bathroom, and kitchen. (adu under pa# 202008081399)Details
unit legalization per ordinance 43-14, planning code section 207.3. legalize (e) dwelling unit 355a capp st. unit included bedrooms, bathroom, and kitchen. (adu under pa# 202008081399) | $35,000 |
| Jul 26, 2021 | Completed final sign-off May 2022 | 892 Noe St | remodel kitchen and bathroom. one bath & one kitchenDetails
remodel kitchen and bathroom. one bath & one kitchen | $42,600 |
| Jul 26, 2021 | Completed final sign-off Apr 2022 | 3401 20th St | remodel kitchen and bathroom. one kithcen, one bath.Details
remodel kitchen and bathroom. one kithcen, one bath. | $44,600 |
| Feb 10, 2021 | Completed final sign-off Apr 2022 | 355 Capp St | interior renovation: includes selective demo and new construction of non structural partitions, addition of half bath, reconfigure walls to add one bedroom, (e) kitchen and bathroom finishes, appliances, fixtures and cabinet replacement.Details
interior renovation: includes selective demo and new construction of non structural partitions, addition of half bath, reconfigure walls to add one bedroom, (e) kitchen and bathroom finishes, appliances, fixtures and cabinet replacement. | $20,000 |
| Aug 8, 2020 | In progress issued Nov 2024 | 355 Capp St | add 1 (n) dwelling unit (adu) per ca govt section 65852.2: convert (e) garage and storage space to one new adu. new unit within existing building footprint. new units included bedrooms, bathroom, and kitchen.Details
add 1 (n) dwelling unit (adu) per ca govt section 65852.2: convert (e) garage and storage space to one new adu. new unit within existing building footprint. new units included bedrooms, bathroom, and kitchen. | $50,000 |
| Sep 12, 2019 | Completed final sign-off May 2020 | 543 Chenery St | interior renovation: convert part of the garage into 1 bedroom, 1 bath room, a closet, there is no vertical or horizontal expansion outside the building envelopeDetails
interior renovation: convert part of the garage into 1 bedroom, 1 bath room, a closet, there is no vertical or horizontal expansion outside the building envelope | $50,000 |
| Jun 18, 2019 | Completed final sign-off Feb 2020 | 2821 Taraval St | new bedroom, bathroom, laundry @ ground floor. remodel (e) kitchen & bathroom @ 2nd floor. remove fireplaceDetails
new bedroom, bathroom, laundry @ ground floor. remodel (e) kitchen & bathroom @ 2nd floor. remove fireplace | $75,000 |
| Feb 11, 2019 | Completed final sign-off Jul 2019 | 892 Noe St | unit #b: remodel kitchen, 9'x9' and bathroom, 7 1/2'x5'Details
unit #b: remodel kitchen, 9'x9' and bathroom, 7 1/2'x5' | $9,000 |
| Jan 18, 2019 | Completed final sign-off Mar 2020 | 867 47th Av | comply w/ complaint #201919751. per ordinance# 43-14, legalize existing ground floor space to a unit - 2 bedrooms, 1 bath, kitchen, fire wall in garage to living space.Details
comply w/ complaint #201919751. per ordinance# 43-14, legalize existing ground floor space to a unit - 2 bedrooms, 1 bath, kitchen, fire wall in garage to living space. | $5,000 |
| May 9, 2018 | Never finaled filed May 2018, never issued | 147 Bright St | unit legalization per ordinance# 43-14. legalize unpermitted work. backyard addition @ 250 sf ground floor for adu. total 2 bed, 1 bath. kitchen. new opening face street @ ground floor.Details
unit legalization per ordinance# 43-14. legalize unpermitted work. backyard addition @ 250 sf ground floor for adu. total 2 bed, 1 bath. kitchen. new opening face street @ ground floor. | $80,000 |
| Apr 10, 2018 | Completed final sign-off Mar 2019 | 1266 07th Av | replace (e) fire escape stair (rotted). remodel (e) kitchen and remove wall btw kit/din. new master bath and ldry r, in (e) areas. no addition to (e) bld conditioned areaDetails
replace (e) fire escape stair (rotted). remodel (e) kitchen and remove wall btw kit/din. new master bath and ldry r, in (e) areas. no addition to (e) bld conditioned area | $60,000 |
| Mar 20, 2018 | Completed final sign-off May 2018 | 1009 Geneva Av | 1st floor: create hallway for exit. remove half bathroomDetails
1st floor: create hallway for exit. remove half bathroom | $2,000 |
| Feb 13, 2018 | Completed final sign-off Mar 2021 | 146 Naples St | 1st floor: add playroom and half bath.Details
1st floor: add playroom and half bath. | $30,000 |
| Sep 11, 2017 | Completed final sign-off Apr 2018 | 1946 30th Av | convert garage into habitable space. 2 bedrooms, 1 full bath, laundry room, enclose foyer. remove interconnecting stair. add 1 bath at upper floor. infill lightwell w/ new skylight.Details
convert garage into habitable space. 2 bedrooms, 1 full bath, laundry room, enclose foyer. remove interconnecting stair. add 1 bath at upper floor. infill lightwell w/ new skylight. | $60,000 |
| Sep 8, 2016 | Completed final sign-off Apr 2017 | 2710 23rd St | remodel kitchen & 1 bathroomDetails
remodel kitchen & 1 bathroom | $15,000 |
| Jun 14, 2016 | Completed final sign-off Aug 2022 | 397 Crescent Av | remodel kitchen and bathroom, change lighting, replace floor, drywall,painting wall. replace doors (2nd floor) drywall to be replaced with 5/8"type x gwb, with 5d cooler nails 4" oc or equal. no walls moved, removed, added or infilled. all existing layouts to remain unchanged.Details
remodel kitchen and bathroom, change lighting, replace floor, drywall,painting wall. replace doors (2nd floor) drywall to be replaced with 5/8"type x gwb, with 5d cooler nails 4" oc or equal. no walls moved, removed, added or infilled. all existing layouts to remain unchanged. | $53,080 |