Back to bathroom remodel contractors
C J Reed Construction Co
- Based in
- Petaluma
- On San Francisco permits
- Jan 2007 to Aug 2026
- Last 24 months
- 42 permits filed
134 permits since 2000: 130 completed, 3 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 7 days from filing to permit and 48 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 4, 2025 | Completed final sign-off May 2025 | 1400 Geary Bl | 7th fl unit 7l-m: combining units (2) studio units into 1 bedroom unit with a full bath . replace plumbing fixtures install shower grab bar backing. add local smoke alarm at sleeping room and living room/ entry area. no exterior workDetails
7th fl unit 7l-m: combining units (2) studio units into 1 bedroom unit with a full bath . replace plumbing fixtures install shower grab bar backing. add local smoke alarm at sleeping room and living room/ entry area. no exterior work | $132,000 |
| Jan 30, 2024 | Completed final sign-off Mar 2024 | 1400 Geary Bl | 5th floor unit 504 - bathroom remodel to include replace tub with shower, shower grab bar backing, and local smoke alarm @ sleeping room and living room/entry area. no exterior workDetails
5th floor unit 504 - bathroom remodel to include replace tub with shower, shower grab bar backing, and local smoke alarm @ sleeping room and living room/entry area. no exterior work | $62,000 |
| Jun 8, 2021 | Completed final sign-off Jul 2021 | 1400 Geary Bl | units 4l & 4m on 4th fl: combine 2 units (4l & 4m) into a one bedroom unit with a full bath and powder room. replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no ecterior work.Details
units 4l & 4m on 4th fl: combine 2 units (4l & 4m) into a one bedroom unit with a full bath and powder room. replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no ecterior work. | $75,000 |
| Feb 11, 2019 | Completed final sign-off Apr 2019 | 1400 Geary Bl | 3rd fl, unit 3g/3h combining 2 studio units into 1 bedroom unit with 2 full baths; replace plumbing fixtures. add local smoke alarm at sleeping room and living room/entry area (n0 exterior work)Details
3rd fl, unit 3g/3h combining 2 studio units into 1 bedroom unit with 2 full baths; replace plumbing fixtures. add local smoke alarm at sleeping room and living room/entry area (n0 exterior work) | $74,000 |
| Oct 31, 2018 | Completed final sign-off Dec 2018 | 1400 Geary Bl | (7th fl unit 7c/7d) - combine two studio units into a one bedroom unit w/full bath and powder rm. replace plumbing fixtures, (n) shower grab bar backing. local smoke alarm at sleeping room and living room/entry area. electrical upgrade for convection-microwave over wet bar.Details
(7th fl unit 7c/7d) - combine two studio units into a one bedroom unit w/full bath and powder rm. replace plumbing fixtures, (n) shower grab bar backing. local smoke alarm at sleeping room and living room/entry area. electrical upgrade for convection-microwave over wet bar. | $73,868 |