C C I Commercial Construction & Improv
- Based in
- San Francisco
- On San Francisco permits
- Oct 2013 to Sep 2026
- Last 24 months
- 55 permits filed
489 permits since 2000: 374 completed, 16 in progress, 70 never finaled, 29 expired or cancelled.
Of the 70 never-finaled permits, 10 are 3 to 5 years old, 49 are 5 to 10 years old, 11 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Roof deck permits
11 roof deck permits: 6 completed, 3 never finaled, 2 expired or cancelled. Typically 175 days from filing to permit and 442 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 3, 2021 | Expired or cancelled withdrawn Mar 2022 | 1011 Bryant St | t.i. interior work: 2/f fill-in, new openings in (e) cmu or concrete walls w/structural reinforcement added. exterior work: converting roof to roof deck w/raised deck system & adding (5) exterior windows.Details
t.i. interior work: 2/f fill-in, new openings in (e) cmu or concrete walls w/structural reinforcement added. exterior work: converting roof to roof deck w/raised deck system & adding (5) exterior windows. | $965,000 |
| Oct 28, 2020 | Completed final sign-off Apr 2022 | 2 Henry Adams St | revision to pa #2018-0913-9936: new roof deck and exit path walkway, extensin of stair #2 to roof. fire/life safety, mep, sprinkler under separate permit.Details
revision to pa #2018-0913-9936: new roof deck and exit path walkway, extensin of stair #2 to roof. fire/life safety, mep, sprinkler under separate permit. | $750,000 |
| Oct 8, 2020 | Completed final sign-off Nov 2021 | 20 Heron St | (n) elevator extension to roof deck, plus new vehicle/man door entrance at rodgers st and new property line windows.Details
(n) elevator extension to roof deck, plus new vehicle/man door entrance at rodgers st and new property line windows. | $48,000 |
| Oct 5, 2020 | Completed final sign-off Apr 2022 | 2 Henry Adams St | revision to approved pa 201809139936 penthouse, roofdeck & elevators. revisions are for elevator # 3 only. mods to hoistway sfaft & structr support for (n) elevator cab. (elevat cab under separate permit). mods to elevator lobbies all flrs & mach rm improvments. mep, life safety under separate permiDetails
revision to approved pa 201809139936 penthouse, roofdeck & elevators. revisions are for elevator # 3 only. mods to hoistway sfaft & structr support for (n) elevator cab. (elevat cab under separate permit). mods to elevator lobbies all flrs & mach rm improvments. mep, life safety under separate permi | $85,000 |
| Mar 7, 2019 | Never finaled issued Dec 2019, no final | 220 Post St | replace ground floor store front. refurbish upper floor building facade. new elevator & lobby at "compton place". new roof deck.Details
replace ground floor store front. refurbish upper floor building facade. new elevator & lobby at "compton place". new roof deck. | $10,000 |
| Feb 4, 2019 | Never finaled issued Nov 2019, no final | 149 09th St | extend existing elevator & stair to rooftop creating stair/elevator enclosure with roof deck and trellis. 1st floor facade alterations at 9th and natoma.Details
extend existing elevator & stair to rooftop creating stair/elevator enclosure with roof deck and trellis. 1st floor facade alterations at 9th and natoma. | $85,000 |
| Feb 4, 2019 | Never finaled issued Mar 2021, no final | 1128 Market St | add new single story elevator access from (e) 6th fl to roof level and adding new roof deck with trellisDetails
add new single story elevator access from (e) 6th fl to roof level and adding new roof deck with trellis | $90,000 |
| Sep 13, 2018 | Completed final sign-off Apr 2022 | 2 Henry Adams St | elevator retrofit demo of (e) elevator system & shaft, new elevator. new elevator lobby. new roof, new walkway pad. curbs, new roof deck. new penthouse interior stairsDetails
elevator retrofit demo of (e) elevator system & shaft, new elevator. new elevator lobby. new roof, new walkway pad. curbs, new roof deck. new penthouse interior stairs | $1,200,000 |
| Nov 12, 2015 | Completed final sign-off Oct 2016 | 30 03rd St | revision to pa 2015-0305-0030. reduction of roof deck. removal of partition wall. add showers back in basement (as previously approved). modify toilet rooms to add fixture count.Details
revision to pa 2015-0305-0030. reduction of roof deck. removal of partition wall. add showers back in basement (as previously approved). modify toilet rooms to add fixture count. | |
| Sep 24, 2014 | Expired or cancelled cancelled Mar 2017 | 400 Alabama St | construction of 724 s.f. roof deck and installation of an exit door from parking garage & security gate at stair 1 (alabama street level). n/a ordinance #155-13Details
construction of 724 s.f. roof deck and installation of an exit door from parking garage & security gate at stair 1 (alabama street level). n/a ordinance #155-13 | $5,000 |
| Oct 17, 2013 | Completed final sign-off Mar 2016 | 1263 Mission St | new ada elevator enclosure to (e) roof & roof deck. addition of starter landing and new segment of inclined ladder at existing fire escape. compliance with ordinance no. 155-13 not required. excavation <50 cu.yd.Details
new ada elevator enclosure to (e) roof & roof deck. addition of starter landing and new segment of inclined ladder at existing fire escape. compliance with ordinance no. 155-13 not required. excavation <50 cu.yd. | $36,000 |