Back to bathroom remodel contractors
C B W Construction Inc.
- Based in
- Daly City
- On San Francisco permits
- Apr 2005 to Jun 2023
- Last 24 months
- 0 permits filed
75 permits since 2000: 37 completed, 30 never finaled, 8 expired or cancelled.
Of the 30 never-finaled permits, 1 is 3 to 5 years old, 9 are 5 to 10 years old, 20 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
24 bathroom remodel permits: 12 completed, 12 never finaled. Typically 10 days from filing to permit and 231 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 15, 2021 | Never finaled issued Sep 2021, no final | 1165 Francisco St | unit 5: remove (e) 9 windows total: (5) side, (3) rear and (1) bathroom. windows at rear not visible from street. replace with (n) windows same size, same style, location and size for all windows. aluminum clad wood. u-factor = 0.58 maxDetails
unit 5: remove (e) 9 windows total: (5) side, (3) rear and (1) bathroom. windows at rear not visible from street. replace with (n) windows same size, same style, location and size for all windows. aluminum clad wood. u-factor = 0.58 max | $9,000 |
| Aug 23, 2021 | Never finaled issued Aug 2021, no final | 1165 Francisco St | unit 5: remodeling kitchen, demo dining doom and living room wall. add new recessed light in liv rm area. replace (e) closet new bathroom at (e) bedroom. add washer and dryer.Details
unit 5: remodeling kitchen, demo dining doom and living room wall. add new recessed light in liv rm area. replace (e) closet new bathroom at (e) bedroom. add washer and dryer. | $80,000 |
| Mar 10, 2020 | Completed final sign-off Oct 2020 | 579 27th St | unit #a: replace "same kind" on flooring, interior doors, tiles, counter tops, paint, bring electrical and plumbing up to code. kitchen and bathrooms remodel//vif fire alarm, if they have one 1103.7.6.1- if not, disregardDetails
unit #a: replace "same kind" on flooring, interior doors, tiles, counter tops, paint, bring electrical and plumbing up to code. kitchen and bathrooms remodel//vif fire alarm, if they have one 1103.7.6.1- if not, disregard | $36,000 |
| Mar 10, 2020 | Completed final sign-off Oct 2020 | 579 27th St | unit #c: replace "same kind" on flooring, interior doors, tiles, counter tops, paint, bring electrical and plumbing up to code. kitchen and bathrooms remodel//vif fire alarm, if they have one 1103.7.6.1- if not, disregardDetails
unit #c: replace "same kind" on flooring, interior doors, tiles, counter tops, paint, bring electrical and plumbing up to code. kitchen and bathrooms remodel//vif fire alarm, if they have one 1103.7.6.1- if not, disregard | $22,000 |
| Mar 10, 2020 | Completed final sign-off Oct 2020 | 579 27th St | unit #b: replace "same kind" on flooring, interior doors, tiles, counter tops, paint, bring electrical and plumbing up to code. kitchen and bathrooms remodel//vif fire alarm, if they have one 1103.7.6.1- if not, disregardDetails
unit #b: replace "same kind" on flooring, interior doors, tiles, counter tops, paint, bring electrical and plumbing up to code. kitchen and bathrooms remodel//vif fire alarm, if they have one 1103.7.6.1- if not, disregard | $22,000 |
| Nov 25, 2019 | Never finaled issued Nov 2019, no final | 577 27th St | kitchens and bathrooms remodel. replace in kind all flooring, interior doors, tiles, counter tops, new paint, electrical and plumbing up to code.Details
kitchens and bathrooms remodel. replace in kind all flooring, interior doors, tiles, counter tops, new paint, electrical and plumbing up to code. | $5,000 |
| May 24, 2019 | Completed final sign-off Nov 2019 | 575 27th St | to replace "same king" on all flooring, interior doors, tiles, countertop, new paint , electrical & plumbing fixtures kitchen and bathroom remodel.Details
to replace "same king" on all flooring, interior doors, tiles, countertop, new paint , electrical & plumbing fixtures kitchen and bathroom remodel. | $45,000 |
| Apr 30, 2019 | Completed final sign-off Oct 2019 | 1165 Francisco St | remodel unit 4. remodel kitchen & 1 bathroom. addition of 1 (n) bedroom. replace 4 windows in-kind. mustl comply with sffd 1103.7.6.1. (n) bedroom to be equipped with rescue window.Details
remodel unit 4. remodel kitchen & 1 bathroom. addition of 1 (n) bedroom. replace 4 windows in-kind. mustl comply with sffd 1103.7.6.1. (n) bedroom to be equipped with rescue window. | $80,000 |
| Apr 30, 2019 | Completed final sign-off Oct 2019 | 1165 Francisco St | remodel unit #1: 2 new bathrooms. replace 6(e) windows in-kind.- not visible from street. remodel kitchen. to comply with 1103.7.6.1 sffc. maher n/a.Details
remodel unit #1: 2 new bathrooms. replace 6(e) windows in-kind.- not visible from street. remodel kitchen. to comply with 1103.7.6.1 sffc. maher n/a. | $80,000 |
| Mar 28, 2016 | Completed final sign-off Aug 2016 | 1165 Francisco St | apt 9, demolish walls in kitchen, restroom. selective wall; rebuild 1 bath, add 1 bath. new walls, window replacement, doors, cabinet, plumbing fixtures, electrical, mechanical, lighting and appliances. maher naDetails
apt 9, demolish walls in kitchen, restroom. selective wall; rebuild 1 bath, add 1 bath. new walls, window replacement, doors, cabinet, plumbing fixtures, electrical, mechanical, lighting and appliances. maher na | $50,000 |
| Mar 2, 2016 | Completed final sign-off Jan 2020 | 667 Howard St | core & shell interior improvement. replace (e) staircase at basement 1st & 2nd floor. remodel & add new ada bathrooms at basement & 2nd floor. and add service lounge at 1st floor. no change of use nor exterior change.Details
core & shell interior improvement. replace (e) staircase at basement 1st & 2nd floor. remodel & add new ada bathrooms at basement & 2nd floor. and add service lounge at 1st floor. no change of use nor exterior change. | $80,000 |
| Aug 27, 2015 | Never finaled issued Jun 2021, no final | 2444 33rd Av | rear vertical & horiz addition for a single family dwelling. 1st fl: add (1)bedrm,(1)bath,(1)laundry,(1)linen closet,(2)closets,storage @ garage & (n)stair to 2nd fl. 2nd fl: add family rm, pantry,storage,stair to 3rd fl. remodel(e)kitchen. 3rd fl: add master bedrm,bathrm,closet,storage & roofdeck.Details
rear vertical & horiz addition for a single family dwelling. 1st fl: add (1)bedrm,(1)bath,(1)laundry,(1)linen closet,(2)closets,storage @ garage & (n)stair to 2nd fl. 2nd fl: add family rm, pantry,storage,stair to 3rd fl. remodel(e)kitchen. 3rd fl: add master bedrm,bathrm,closet,storage & roofdeck. | $200,000 |
| Mar 17, 2014 | Never finaled issued Jan 2016, no final | 138 San Felipe Av | rear addition area including: 1st floor hallway, 2nd floor office & 3rd floor master bathroom. compliance with maher ordinace no. 155-13 not required.Details
rear addition area including: 1st floor hallway, 2nd floor office & 3rd floor master bathroom. compliance with maher ordinace no. 155-13 not required. | $60,000 |
| Feb 21, 2014 | Never finaled issued Feb 2014, no final | 322 29th Av | revision to pa# 201106238762,reduce master bathroom size for storage in 1/f; remove existing wall in closet to make it bigger & remove upstairs bathroom at 4/f , install ejector pump.Details
revision to pa# 201106238762,reduce master bathroom size for storage in 1/f; remove existing wall in closet to make it bigger & remove upstairs bathroom at 4/f , install ejector pump. | $2,500 |
| Jul 25, 2013 | Never finaled issued Jul 2013, no final | 2178 27th Av | remodel existing bedroom into bathroom, demolition of existing bathroom into walk in closet. all work on the 2nd flDetails
remodel existing bedroom into bathroom, demolition of existing bathroom into walk in closet. all work on the 2nd fl | $15,000 |
| Sep 4, 2012 | Never finaled issued Sep 2012, no final | 138 San Felipe Av | interior renovation for single family dwelling unit; renovation including first floor kitchen & second floor bathroom.Details
interior renovation for single family dwelling unit; renovation including first floor kitchen & second floor bathroom. | $14,000 |
| Jan 20, 2012 | Completed final sign-off Sep 2014 | 575 23rd Av | rear addition for a single family dwelling unit. area incl: mstr bedroom, mstr bathroom, walk-in closet (total 460 sq ft) and deck (total 100 sq ft).Details
rear addition for a single family dwelling unit. area incl: mstr bedroom, mstr bathroom, walk-in closet (total 460 sq ft) and deck (total 100 sq ft). | $70,000 |
| Jun 23, 2011 | Never finaled issued Mar 2012, no final | 322 29th Av | convert single dwelling unit into 2 units residential w/ addition to rear of building including new walk-in-closet, master bedroom & bathrooms.Details
convert single dwelling unit into 2 units residential w/ addition to rear of building including new walk-in-closet, master bedroom & bathrooms. | $300,000 |
| Feb 12, 2010 | Never finaled issued Dec 2010, no final | 415 Oxford St | vertical & horizontal addition. removed illegal unit on ground floor. (kitchen, 2 bedrooms, living room & 1 bath). add 1 full bathroom, 1 exercise room on ground floor. enclose (e) garage. interior full remodel & new roof deck on 2nd floor. add new 3rd floor.Details
vertical & horizontal addition. removed illegal unit on ground floor. (kitchen, 2 bedrooms, living room & 1 bath). add 1 full bathroom, 1 exercise room on ground floor. enclose (e) garage. interior full remodel & new roof deck on 2nd floor. add new 3rd floor. | $150,000 |
| Aug 6, 2009 | Completed final sign-off Feb 2010 | 2363 18th Av | remodel (e) kitchen, bath rms, add one new bath rm and study rm. at 2nd fl. construct 2 bed rms, laundry rm and 2 full bath rms. at ground floor.Details
remodel (e) kitchen, bath rms, add one new bath rm and study rm. at 2nd fl. construct 2 bed rms, laundry rm and 2 full bath rms. at ground floor. | $58,000 |
| Apr 10, 2008 | Never finaled issued Apr 2008, no final | 1160 Mission St | work @ unit# 2213 only. replace one bathroom tub into jacuzi, replace one bathtub into shower. no changes to kitchen & bedroom. add electrical outlets for electrical blinds. no structural work. shower min 30" in any dimension.Details
work @ unit# 2213 only. replace one bathroom tub into jacuzi, replace one bathtub into shower. no changes to kitchen & bedroom. add electrical outlets for electrical blinds. no structural work. shower min 30" in any dimension. | $12,900 |
| Sep 10, 2007 | Completed final sign-off Dec 2008 | 41 Grand View Tr | remodel (2) kitchens, (4) bathrooms, new laminated hardwood floor, paint. all to be same location, no structural work, new lighting to be fluorescent.Details
remodel (2) kitchens, (4) bathrooms, new laminated hardwood floor, paint. all to be same location, no structural work, new lighting to be fluorescent. | $42,000 |
| Jul 31, 2007 | Never finaled issued Jul 2007, no final | 563 36th Av | replace new cabinets in kitchen and 2 bathroom, new tiles. change carpet to laminted hardwood floor, interior painting. no change to partitions no windows.Details
replace new cabinets in kitchen and 2 bathroom, new tiles. change carpet to laminted hardwood floor, interior painting. no change to partitions no windows. | $21,000 |
| Feb 15, 2006 | Completed final sign-off May 2008 | 1211 34th Av | for site permit only. remodel 1st floor to 2nd unit. new partition walls to create new bedrooms, bath, and kitchen. new 2 car garage.Details
for site permit only. remodel 1st floor to 2nd unit. new partition walls to create new bedrooms, bath, and kitchen. new 2 car garage. | $20,000 |