Back to bathroom remodel contractors
C & B Construction Co.
- Based in
- Oakland
- On San Francisco permits
- Aug 2006 to May 2015
- Last 24 months
- 0 permits filed
10 permits since 2000: 6 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 3 completed, 1 never finaled, 1 expired or cancelled. Typically 1 days from filing to permit and 90 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 29, 2015 | Never finaled issued Jul 2015, no final | 3641 Noriega St | remodel 1st fl to include addition of 1 bedroom and media room. (existing full bath and bedroom to remain) new walls per plan. add plywood to rear wall per plan.Details
remodel 1st fl to include addition of 1 bedroom and media room. (existing full bath and bedroom to remain) new walls per plan. add plywood to rear wall per plan. | $30,000 |
| Jul 16, 2013 | Expired or cancelled expired Jun 2018 | 3641 Noriega St | kitchen & bath remodel: minor wall alterations, electrical & plumbing adjustments minimal, extension of gas line for new stove location.Details
kitchen & bath remodel: minor wall alterations, electrical & plumbing adjustments minimal, extension of gas line for new stove location. | $9,999 |
| Jul 30, 2010 | Completed final sign-off Sep 2010 | 1910 Anza St | 3rd floor: remodel bathroom, change toilet, sink, shower, electrical .Details
3rd floor: remodel bathroom, change toilet, sink, shower, electrical . | $6,500 |
| Jul 20, 2009 | Completed final sign-off Oct 2009 | 227 Arch St | 1st floor interior remodelling to add one family room and 1 bath. remodel 2nd floor kitchen and bath room and replace 5 windows.Details
1st floor interior remodelling to add one family room and 1 bath. remodel 2nd floor kitchen and bath room and replace 5 windows. | $42,400 |
| Aug 26, 2008 | Completed final sign-off Nov 2008 | 3525 16th St | work @ unit# 3527 only. bathroom remodel. replace water pipe, shower tub. provide exhaust fan w/ bdd terminating min 3' from pl & opening. provide fluorescent light or t-24 occupancy sensor ("manual on") in bathroom.Details
work @ unit# 3527 only. bathroom remodel. replace water pipe, shower tub. provide exhaust fan w/ bdd terminating min 3' from pl & opening. provide fluorescent light or t-24 occupancy sensor ("manual on") in bathroom. | $3,500 |