Back to bathroom remodel contractors
C B And R Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2018 to Nov 2023
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 1 days from filing to permit and 603 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 28, 2019 | Completed final sign-off Jan 2021 | 752 Head St | upgrade of (1) existing kitchen and (1) existing bathroom upstairs (2nd floor).Details
upgrade of (1) existing kitchen and (1) existing bathroom upstairs (2nd floor). | $15,000 |
| Mar 14, 2019 | Completed final sign-off Jan 2021 | 752 Head St | proposed remodel existing 1st fl- adding 2 new bedrooms and a full bathroomDetails
proposed remodel existing 1st fl- adding 2 new bedrooms and a full bathroom | $50,000 |
| Nov 20, 2018 | Completed final sign-off Jun 2019 | 120 Broad St | convert (e) laundry room to a bedroom, bathroom; add 1 bedroom and bath on ground floor. add one bathroom to 2nd floor. relocate water heater and washer & dryerDetails
convert (e) laundry room to a bedroom, bathroom; add 1 bedroom and bath on ground floor. add one bathroom to 2nd floor. relocate water heater and washer & dryer | $40,000 |