Back to bathroom remodel contractors
Burradell Construction Inc---See Notes
- Based in
- San Francisco
- On San Francisco permits
- Oct 2008 to Feb 2020
- Last 24 months
- 0 permits filed
75 permits since 2000: 55 completed, 8 never finaled, 12 expired or cancelled.
Of the 8 never-finaled permits, 2 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
32 bathroom remodel permits: 22 completed, 4 never finaled, 6 expired or cancelled. Typically 0 days from filing to permit and 248 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 19, 2017 | Completed final sign-off Jun 2018 | 1614 Diamond St | remodel (2) top floor baths including new shower pansDetails
remodel (2) top floor baths including new shower pans | $5,000 |
| Sep 19, 2017 | Completed final sign-off Mar 2023 | 4031 19th St | master bath remodel, including replacing tile in shower on floor. new shower pan. new vanity counter.Details
master bath remodel, including replacing tile in shower on floor. new shower pan. new vanity counter. | $5,000 |
| Jul 28, 2017 | Expired or cancelled cancelled Apr 2018 | 2815 22nd St | revision to pa 2017-0329-2636 convert proposed office to (n) bathroom at 1st floorDetails
revision to pa 2017-0329-2636 convert proposed office to (n) bathroom at 1st floor | $10,000 |
| Mar 29, 2017 | Completed final sign-off Mar 2018 | 2815 22nd St | adding (n) bath, family, bedroom & office @ ground floor; one story infill @ lightwell < 10 ft in height. voluntary foundation strengthening & seismic upgrade @ ground floor onlyDetails
adding (n) bath, family, bedroom & office @ ground floor; one story infill @ lightwell < 10 ft in height. voluntary foundation strengthening & seismic upgrade @ ground floor only | $50,000 |
| Mar 22, 2017 | Completed final sign-off Jul 2017 | 1409 Douglass St | remodel 4 full baths & one kitchen , r&r in kind siding where rotted at main floor, patio door, 3 new shower pans no structural/ walls removedDetails
remodel 4 full baths & one kitchen , r&r in kind siding where rotted at main floor, patio door, 3 new shower pans no structural/ walls removed | $5,300 |
| Dec 14, 2016 | Completed final sign-off May 2020 | 3437 Fillmore St | 4 story remodel of 2 units bldg(incl elect.)g/f:(n)kitchen;(re) bath(n)stairs to 2/f;(n) fire rated corridor to yard,(n)front door; 2/f:relocate kitchen,remove ceiling@living rm,(re) baths,replace windows in kind(n) stairs.3/f: remove kitchen,(re) baths,replace windows in kind(n) laundry;Details
4 story remodel of 2 units bldg(incl elect.)g/f:(n)kitchen;(re) bath(n)stairs to 2/f;(n) fire rated corridor to yard,(n)front door; 2/f:relocate kitchen,remove ceiling@living rm,(re) baths,replace windows in kind(n) stairs.3/f: remove kitchen,(re) baths,replace windows in kind(n) laundry; | $250,000 |
| Jul 8, 2016 | Expired or cancelled cancelled Mar 2023 | 3437 Fillmore St | interior remodel of 1st & 2nd flr: new mechanical, living, and bathroom on 1st. new habitable space at the 1st flr - 609 sf new pantry & den, remodel 2 bathrooms at 2nd flr; n/a maher ord.Details
interior remodel of 1st & 2nd flr: new mechanical, living, and bathroom on 1st. new habitable space at the 1st flr - 609 sf new pantry & den, remodel 2 bathrooms at 2nd flr; n/a maher ord. | $200,000 |
| Jun 6, 2016 | Expired or cancelled expired Nov 2017 | 71 Westwood Dr | ground flr remodel: add bedroom, bath and family room. no structural workDetails
ground flr remodel: add bedroom, bath and family room. no structural work | $3,000 |
| Apr 22, 2016 | Completed final sign-off Nov 2016 | 76 Raymond Av | 1)remodel extg kitchen, 2 bathrooms, replace sheetrock with new and re-wire elect. at 2nd floor. 2)construct 2 bedrooms . family room, and laundry area and one full bath room at ground floor. 3)construct new deck with staircase at rear of bldg. size approx. 16'x7'Details
1)remodel extg kitchen, 2 bathrooms, replace sheetrock with new and re-wire elect. at 2nd floor. 2)construct 2 bedrooms . family room, and laundry area and one full bath room at ground floor. 3)construct new deck with staircase at rear of bldg. size approx. 16'x7' | $83,000 |
| Mar 15, 2016 | Completed final sign-off Nov 2016 | 30 Amethyst Wy | remodel 2 bathrooms on top floor - no change to walls or fixture locations.Details
remodel 2 bathrooms on top floor - no change to walls or fixture locations. | $27,000 |
| Feb 19, 2016 | Expired or cancelled expired Nov 2022 | 3437 Fillmore St | remodel 3 full baths & 1 powder. no alteratoin of wall, window, and door.Details
remodel 3 full baths & 1 powder. no alteratoin of wall, window, and door. | $6,000 |
| Feb 19, 2016 | Never finaled issued Feb 2016, no final | 3439 Fillmore St | remodel 2 full baths, 1 master bathroom & 1 powder. no alteratoin of wall, window, and door.Details
remodel 2 full baths, 1 master bathroom & 1 powder. no alteratoin of wall, window, and door. | $48,000 |
| Feb 18, 2016 | Completed final sign-off Nov 2016 | 30 Amethyst Wy | main fl: reconfigure kitchen, demo e powder rm, build new powder rm at new location, build new kitchen, add additional lighting in family room, dining rm, living rm. upper fl: minor remodel of 2 e baths with new fixtures, cabinets, tileDetails
main fl: reconfigure kitchen, demo e powder rm, build new powder rm at new location, build new kitchen, add additional lighting in family room, dining rm, living rm. upper fl: minor remodel of 2 e baths with new fixtures, cabinets, tile | $100,000 |
| Feb 11, 2016 | Completed final sign-off Feb 2017 | 4652 18th St | upper unit: remodel kitchen and master bath-not moving walls-replace all plumbing and light fixtures, new tile, cabinetry & counter tops.Details
upper unit: remodel kitchen and master bath-not moving walls-replace all plumbing and light fixtures, new tile, cabinetry & counter tops. | $30,000 |
| Feb 11, 2016 | Completed final sign-off Feb 2017 | 4434 17th St | upper/main floor bath remodel: not moving walls,new plumbing fixtures & tile- replace tub w/shower pan.Details
upper/main floor bath remodel: not moving walls,new plumbing fixtures & tile- replace tub w/shower pan. | $30,000 |
| Jan 11, 2016 | Expired or cancelled expired Oct 2023 | 129 Westwood Dr | add (n) partition walls on ground floor/garage level to create (n) bathroom, (n) bedroom, and (n) family room. no structural workDetails
add (n) partition walls on ground floor/garage level to create (n) bathroom, (n) bedroom, and (n) family room. no structural work | $15,000 |
| Sep 21, 2015 | Completed final sign-off Mar 2017 | 129 Westwood Dr | remodel master bath and hall bath. no wlals removed and no structural owrk. add shower pan in master to replace (e) plastic panDetails
remodel master bath and hall bath. no wlals removed and no structural owrk. add shower pan in master to replace (e) plastic pan | $28,000 |
| Jun 8, 2015 | Completed final sign-off Mar 2016 | 119 Gates St | kitchen and 1 bathroom remodel. no change in walls; to comply with cec150.0(k)3 & 5Details
kitchen and 1 bathroom remodel. no change in walls; to comply with cec150.0(k)3 & 5 | $15,000 |
| Nov 7, 2014 | Completed final sign-off Jul 2015 | 267 Hermann St | remodel units 269 and 271 kitchens and baths. no walls to be removedDetails
remodel units 269 and 271 kitchens and baths. no walls to be removed | $50,000 |
| Oct 23, 2014 | Completed final sign-off Apr 2015 | 2081 14th Av | kitchen and bath remodel - no change to windows & walls (all existing & in kind). kitchen lighing & control per cec 150(k).Details
kitchen and bath remodel - no change to windows & walls (all existing & in kind). kitchen lighing & control per cec 150(k). | $18,000 |
| Oct 16, 2014 | Never finaled issued Nov 2014, no final | 540 Delancey St | remodel and replace old kitchen with 100% new cabinets, appliances, counters and finishes. remodel existing bathroom, remove (2) non bearing partitions at closet. n/a ordinance #155-13.Details
remodel and replace old kitchen with 100% new cabinets, appliances, counters and finishes. remodel existing bathroom, remove (2) non bearing partitions at closet. n/a ordinance #155-13. | $47,272 |
| May 9, 2014 | Expired or cancelled expired Feb 2017 | 168 Evelyn Wy | remodel 1 bathroom- no change in fixture location; to comply with cec150(k) 10Details
remodel 1 bathroom- no change in fixture location; to comply with cec150(k) 10 | $6,000 |
| Jul 5, 2013 | Completed final sign-off Sep 2014 | 470 18th Av | new kitchen and bath fans to connect (e) dutcs. kitchen and bath remodel - fixture location remain same - no structural work or walls moved. new lighting 50% in kitchen light to be high efficacy/ prvide occupancy sensor in bath.Details
new kitchen and bath fans to connect (e) dutcs. kitchen and bath remodel - fixture location remain same - no structural work or walls moved. new lighting 50% in kitchen light to be high efficacy/ prvide occupancy sensor in bath. | $40,000 |
| Oct 17, 2012 | Never finaled issued Oct 2012, no final | 355 Buena Vista East Av | kitchen remodel - new cabinets and counter tops - new plumbing and electrical fixtures - bath remodel - remove tub/install shower pan. new vanity and counter top - new plumbing and electrical fixtures. lighting shall comply with cec 150(k). no change to exhaust system. comply with co/alrm perDetails
kitchen remodel - new cabinets and counter tops - new plumbing and electrical fixtures - bath remodel - remove tub/install shower pan. new vanity and counter top - new plumbing and electrical fixtures. lighting shall comply with cec 150(k). no change to exhaust system. comply with co/alrm per | $12,000 |
| Oct 17, 2012 | Completed final sign-off Jan 2013 | 601 Van Ness Av | kitchen remodel - new cabinets and counter tops - new plumbing and electrical fixtures - bath remodel - new vanity, counter top, tub & toilet. no structural work -not moving walls. lighting shall comply with cec 250(k). no change to exhaust system. comply with co alarms per cbc.Details
kitchen remodel - new cabinets and counter tops - new plumbing and electrical fixtures - bath remodel - new vanity, counter top, tub & toilet. no structural work -not moving walls. lighting shall comply with cec 250(k). no change to exhaust system. comply with co alarms per cbc. | $8,000 |
| Oct 9, 2012 | Completed final sign-off Dec 2012 | 1061 Dolores St | master bath remodel - replace existing shower pan, tub & toilet in existing locations, new tile, 60 sf, no structural.Details
master bath remodel - replace existing shower pan, tub & toilet in existing locations, new tile, 60 sf, no structural. | $1,000 |
| May 23, 2012 | Never finaled issued May 2012, no final | 8 Clayton St | new bathroom vanity & vanity faucet - new laundry hook ups. no wall changes.Details
new bathroom vanity & vanity faucet - new laundry hook ups. no wall changes. | $5,000 |
| May 23, 2012 | Completed final sign-off Jan 2014 | 566 08th Av | bathroom remodel: remove tub and install shower pan - no change in fixture locations - no walls changed/reconfigured - seal west facing window - add 2x2 skylight.Details
bathroom remodel: remove tub and install shower pan - no change in fixture locations - no walls changed/reconfigured - seal west facing window - add 2x2 skylight. | $7,000 |
| Mar 27, 2012 | Completed final sign-off Jul 2012 | 2026 15th St | bathroom remodel with new shower pan, fixtures location to remain, no layout/structural change. lighting to comply with cec150(k)Details
bathroom remodel with new shower pan, fixtures location to remain, no layout/structural change. lighting to comply with cec150(k) | $7,000 |
| May 27, 2011 | Completed final sign-off Nov 2011 | 168 Evelyn Wy | remodel bathroom w/new fixtures, new tile . add new ktichen sink, counter, winden opening in non-bearing wall (parallel to joists/rafters), no change in anyway to exterior of bldg, except one (e) window change on side, not visible from street.Details
remodel bathroom w/new fixtures, new tile . add new ktichen sink, counter, winden opening in non-bearing wall (parallel to joists/rafters), no change in anyway to exterior of bldg, except one (e) window change on side, not visible from street. | $27,274 |
| May 24, 2010 | Completed final sign-off Jan 2011 | 3952 26th St | remodel interior of units 3962,3956, 3958 including bathrooms, kitchens, living rooms, replacing front windows with dual glazed wood windows in kind and rear windows with dual glazed vinyl . add 1 bathroom in units 3952,3956,3958. new skylights, rear doors in e openings at rear.Details
remodel interior of units 3962,3956, 3958 including bathrooms, kitchens, living rooms, replacing front windows with dual glazed wood windows in kind and rear windows with dual glazed vinyl . add 1 bathroom in units 3952,3956,3958. new skylights, rear doors in e openings at rear. | $138,000 |
| Oct 30, 2008 | Completed final sign-off Jun 2012 | 573 Diamond St | add new family room at 1st floor level, expand (e) bedroom & new bath at 2nd floor level, expand (e) ground floor level below new family room, addition & add new dormers at (e) bedroom #3 and bath.Details
add new family room at 1st floor level, expand (e) bedroom & new bath at 2nd floor level, expand (e) ground floor level below new family room, addition & add new dormers at (e) bedroom #3 and bath. | $150,000 |