Back to bathroom remodel contractors
Burdell Construction
- Based in
- Novato
- On San Francisco permits
- Feb 2014 to Oct 2026
- Last 24 months
- 9 permits filed
12 permits since 2000: 8 completed, 3 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Bathroom remodel permits
4 bathroom remodel permits: 1 completed, 2 in progress, 1 expired or cancelled. Typically 84 days from filing to permit and 96 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 16, 2026 | In progress issued Sep 2026 | 4044 22nd St | reno & vertical addition, new roof deck (e) non-conforming structure. updates to mep system. 1/f: new family room w/sink & 2-burner cooktop, relocate full bath, new sauna, new wine cellar, outdoor bar w/bev fridge & gas grill. 2/f: reconfig layout. 3/f: new master bed & bath, laundry, gas fire bowl.Details
reno & vertical addition, new roof deck (e) non-conforming structure. updates to mep system. 1/f: new family room w/sink & 2-burner cooktop, relocate full bath, new sauna, new wine cellar, outdoor bar w/bev fridge & gas grill. 2/f: reconfig layout. 3/f: new master bed & bath, laundry, gas fire bowl. | $400,000 |
| Feb 25, 2026 | In progress issued Oct 2026 | 282 Chattanooga St | remodel bathrooms and kitchen. convert unconditioned greenhouse space at the rear to conditioned space.Details
remodel bathrooms and kitchen. convert unconditioned greenhouse space at the rear to conditioned space. | $200,000 |
| Aug 29, 2014 | Expired or cancelled cancelled Jan 2015 | 1774 Sanchez St | fix dry rot in bathroom, window replacement, new fixtures & vault bathroom ceiling, replace roof over bathroom & shed, lower unit, max u factor 0.40Details
fix dry rot in bathroom, window replacement, new fixtures & vault bathroom ceiling, replace roof over bathroom & shed, lower unit, max u factor 0.40 | $7,000 |
| Feb 6, 2014 | Completed final sign-off May 2014 | 1774 Sanchez St | remodel large closet into 1/2 bath, remodel kitchen cabinets & countertops, make 2 large windows into exterior doors, open dividing wall 30", update electrical.Details
remodel large closet into 1/2 bath, remodel kitchen cabinets & countertops, make 2 large windows into exterior doors, open dividing wall 30", update electrical. | $35,000 |