Building Services General Contractor
- Based in
- Novato
- On San Francisco permits
- Aug 2000 to Nov 2017
- Last 24 months
- 0 permits filed
13 permits since 2000: 12 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 0 days from filing to permit and 46 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 29, 2016 | Completed final sign-off Dec 2016 | 135 Beaver St | repair rear upper deck railing - less than 50%.Details
repair rear upper deck railing - less than 50%. | $950 |
| Dec 8, 2015 | Completed final sign-off Feb 2016 | 169 Collingwood St | all work on rear of house on 2nd floor: replace three existing double hung windows w/ new insulated windows and two existing windows w/ sliders for new deck(with sep. permit) . install 42" railing on one slider.Details
all work on rear of house on 2nd floor: replace three existing double hung windows w/ new insulated windows and two existing windows w/ sliders for new deck(with sep. permit) . install 42" railing on one slider. | $15,000 |