Back to bathroom remodel contractors
Building Concepts
- Based in
- Richmond
- On San Francisco permits
- Oct 2016 to Dec 2016
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 14 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 7, 2016 | Completed final sign-off Dec 2016 | 584 43rd Av | replace 2 existing 2nd floor double hung bathroom light well windows with like size 21 3/4 x 47 1/2 milgard tuscany double hung tempered obscured glass, title 24 compliant insert windows.Details
replace 2 existing 2nd floor double hung bathroom light well windows with like size 21 3/4 x 47 1/2 milgard tuscany double hung tempered obscured glass, title 24 compliant insert windows. | $1,500 |