Buildergirl Design And Construction
- Based in
- Mill Valley
- On San Francisco permits
- Apr 2013 to Mar 2022
- Last 24 months
- 0 permits filed
5 permits since 2000: 3 completed, 2 never finaled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 0 days from filing to permit and 28 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 23, 2013 | Completed final sign-off May 2013 | 330 Rutledge St | install horizontal holdowns (simpson dtt2z @48" o.c. 5 places total) to reinforce connectionbetween existing deck joists to existing bldg floor joists with full blocking at 2 joist bays back with a34 clips on ends of block. add 2 fsa anchor with 1/2" titens @ each of 4 existing deck posts.Details
install horizontal holdowns (simpson dtt2z @48" o.c. 5 places total) to reinforce connectionbetween existing deck joists to existing bldg floor joists with full blocking at 2 joist bays back with a34 clips on ends of block. add 2 fsa anchor with 1/2" titens @ each of 4 existing deck posts. | $500 |
| Apr 8, 2013 | Completed final sign-off May 2013 | 330 Rutledge St | repair electrical, install laminate flooring in kitchen, replace gas wall heater with new, repair 2 lkeaing facuets, replace kitchen stove/oven, replace small 4 step entry with smae, replace deck railing 2ith 42"/ 3" picket space code & deck ledger board, paint exteriorDetails
repair electrical, install laminate flooring in kitchen, replace gas wall heater with new, repair 2 lkeaing facuets, replace kitchen stove/oven, replace small 4 step entry with smae, replace deck railing 2ith 42"/ 3" picket space code & deck ledger board, paint exterior | $20,000 |